STUDBOLT,7/8INX80MM,B8M/8M

Material 4100026543 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100026543
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
RAJAWALI INSTRUMEN INTERNASIONAL PT
Lead time
28 d · P80 39 d
Unit price
Rp 82,673

Recommendation

  • 1.Forecast 15 EA/year: 15 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~28 days; expected demand during lead time 1.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 27.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 23 now.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 28 days
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 11
Rec. Max
27
order qty 15
Service level
100.0%
stockout risk now 3%
Unit price
Rp 82,673
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 300 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 799.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 4 functional locations

4 with criticality A/B · 48 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A122911.58
PX_PP-1801A
DEMIN WATER PUMP
A810.19
PX_KC-223
RECYCLE ETHANE FAN
A2000.57
PX_VD-1044
CAUSTIC SEPARATOR
A800.08

Lead time and procurement

Lead time 28 ± 26 days (PO history, 5 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
02 Jun 2026PR03
Regular replenishment
1Rp 80,94618 Jun 202616 d
12 Jan 2026PR03
Regular replenishment
1Rp 85,16707 Feb 202626 d
12 Aug 2025PR03
Regular replenishment
1Rp 82,67323 Aug 202511 d
10 Jul 2025PR03
Regular replenishment
1Rp 85,82123 Jul 202513 d
25 Jun 2025PR06
Regular replenishment
1Rp 79,48822 Sept 202589 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109
09 Jul 2026LowPX_BF-109Leak from packing
01 Jul 2026EmergencyPX_BF-109[MSI-B-26-YDN-280/M] Replace line
23 Jun 2026HighPX_BF-109Cleaning burner BF-109

Recent goods issues

Posting dateQtyOrderOrder type
05 Dec 20254201000002266Corrective