STUDBOLT,7/8INX80MM,B8M/8M
Material 4100026543 · STUDBOLT · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100026543
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 28 d · P80 39 d
- Unit price
- Rp 82,673
Recommendation
- 1.Forecast 15 EA/year: 15 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~28 days; expected demand during lead time 1.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 27.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 23 now.
- 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
23 EA
Rp 1.9M · order by 01 Oct 2026
Expected arrival ≈ 28 days
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 11
Rec. Max
27
order qty 15
Service level
100.0%
stockout risk now 3%
Unit price
Rp 82,673
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 300 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 799.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 4 functional locations
4 with criticality A/B · 48 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-109 CRACKING FURNACE BF-109 | A | 12 | 29 | 11.58 |
| PX_PP-1801A DEMIN WATER PUMP | A | 8 | 1 | 0.19 |
| PX_KC-223 RECYCLE ETHANE FAN | A | 20 | 0 | 0.57 |
| PX_VD-1044 CAUSTIC SEPARATOR | A | 8 | 0 | 0.08 |
Lead time and procurement
Lead time 28 ± 26 days (PO history, 5 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 02 Jun 2026 | PR03 Regular replenishment | 1 | Rp 80,946 | 18 Jun 2026 | 16 d |
| 12 Jan 2026 | PR03 Regular replenishment | 1 | Rp 85,167 | 07 Feb 2026 | 26 d |
| 12 Aug 2025 | PR03 Regular replenishment | 1 | Rp 82,673 | 23 Aug 2025 | 11 d |
| 10 Jul 2025 | PR03 Regular replenishment | 1 | Rp 85,821 | 23 Jul 2025 | 13 d |
| 25 Jun 2025 | PR06 Regular replenishment | 1 | Rp 79,488 | 22 Sept 2025 | 89 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Sept 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 13 Sept 2026 | Medium | PX_BF-109 | Install scaffolding at BF-109 |
| 03 Sept 2026 | Low | PX_BF-109 | Install scaffolding at BF-109 |
| 02 Sept 2026 | Low | PX_BF-109 | Install cover plate for MCP cracking |
| 16 Aug 2026 | Medium | PX_BF-109 | Install cover plate BF-109 |
| 13 Jul 2026 | Medium | PX_BF-109 | Cleaning burner BF-109 |
| 09 Jul 2026 | Medium | PX_BF-109 | Thermograph wall BF-109 |
| 09 Jul 2026 | Low | PX_BF-109 | Leak from packing |
| 01 Jul 2026 | Emergency | PX_BF-109 | [MSI-B-26-YDN-280/M] Replace line |
| 23 Jun 2026 | High | PX_BF-109 | Cleaning burner BF-109 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Dec 2025 | 4 | 201000002266 | Corrective |