Sparely
DU

STUDBOLT,5/8INX90MM,B8M/8M

Material 4100026566 · STUDBOLT · Plant 1000

AMonitorSlow-moving
Material
4100026566
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
RAJAWALI SARANA SENTOSA PT
Lead time
26 d · P80 39 d
Unit price
Rp 9,031

Recommendation

  • 1.Forecast 35 EA/year: 35 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 2.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 96, order up to 144.
  • 4.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Single source
On hand / on order
128 / 0
no open PO
Today Min / Max
23 / 63
static parameters in BoM
Rec. Min (reorder point)
96
safety stock 94
Rec. Max
144
order qty 48
Service level
100.0%
stockout risk now 0%
Unit price
Rp 9,031
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 402 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 155.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

2 with criticality A/B · 36 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1651
BFW PUMP
A2041.05
PX_HE-884B
RECYCLE ETHANE TLE
A1621.08

Lead time and procurement

Lead time 26 ± 15 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
30 May 2026PR04
Regular (other)
10Rp 9,03105 Jul 202636 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 May 2026HighPX_PP-1651Painting PP-1651
08 Jan 2026MediumPX_PP-1651Leak from packing
03 Oct 2025LowPX_PP-1651Oil leak at PP-1651 bearing housing
21 Aug 2025HighPX_HE-884BCleaning HE-884B
03 Aug 2025LowPX_HE-884BLeak from packing
14 May 2025LowPX_PP-1651PP-1651 high vibration

Recent goods issues

Posting dateQtyOrderOrder type
25 Aug 202548201000022581Corrective