STUDBOLT,1INX60MM,B7/2H
Material 4100026578 · STUDBOLT · Plant 1000
BReduceSlow-moving
- Material
- 4100026578
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 43 EA/year: 43 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 2.7.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 74, order up to 148.
- 4.Stock 224 exceeds the level to keep (148) by 76.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
224 / 0
no open PO
Today Min / Max
42 / 112
static parameters in BoM
Rec. Min (reorder point)
74
safety stock 72
Rec. Max
148
order qty 74
Service level
99.9%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 215 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 31.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.
Installed on 2 functional locations
1 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1287D CHARGE GAS CONDENSER | B | 4 | 1 | 0.22 |
| PX_ROF-1698 LP STEAM TO VD-1823 | C | 20 | 0 | 0.00 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 24 May 2025 | Low | PX_HE-1287D | Install scaffolding at HE-1287D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Feb 2026 | 96 | 201000034944 | Corrective |
| 28 Feb 2026 | 4 | 201000034944 | Corrective |
| 27 Aug 2025 | 48 | 201000025124 | Corrective |