STUDBOLT,1INX85MM,B8M/8M

Material 4100026609 · STUDBOLT · Plant 1000

ASafety-criticalReduceSlow-moving
Material
4100026609
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 5.1 EA/year: 5.1 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 0.3.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 14.
  • 5.Stock 569 exceeds the level to keep (204) by 365; the level includes the 204 used in the last turnaround.
  • 6.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Safety-critical (SCE)Last turnaround used 204Price estimatedLead time estimated
On hand / on order
569 / 0
no open PO
Today Min / Max
10 / 28
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
14
order qty 6
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 240 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (204 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 271.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

3 with criticality A/B · 104 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1945B
PROPYLENE PUMP
A2041.47
PX_VD-664B
METHANE KO DRUM
A2430.93
PX_TCV-254
TEMPERATURE CONTROL VALVE
B2400.12
PX_KT-778A
TURBINE FOR KC-778A
S1601.10
PX_PRV-1201
SAFETY VALVE HE-1502B
S2000.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_VD-664BLeak from packing
20 Jan 2026LowPX_PP-1945BPP-1945B high vibration
27 Nov 2025MediumPX_VD-664BVD-664B level glass broken
28 Aug 2025LowPX_PP-1945BReplace lamp as per PM finding
13 Aug 2025LowPX_PP-1945BInstall scaffolding at PP-1945B
11 Aug 2025MediumPX_PP-1945BLeak from packing
30 May 2025LowPX_VD-664BLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Feb 20264201000032240Corrective
22 Dec 202512203000022966Turnaround
19 Dec 202548203000022966Turnaround
19 Dec 2025144203000022966Turnaround