Sparely
DU

STUDBOLT,7/8INX50MM,B8M/8M

Material 4100026647 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100026647
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 5 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
19 d · P80 39 d
Unit price
Rp 10,546

Recommendation

  • 1.Forecast 30 EA/year: 27 unplanned (credibility blend: own history + installed-base prior) + 2.9 from the maintenance plan.
  • 2.Lead time ~19 days; expected demand during lead time 1.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 32, order up to 62.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 60 now.
  • 5.Installed on 5 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
60 EA
Rp 632,760 · order by 01 Oct 2026
Expected arrival ≈ 19 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
32
safety stock 31
Rec. Max
62
order qty 30
Service level
100.0%
stockout risk now 9%
Unit price
Rp 10,546
PO history
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 404 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 362.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

1 with criticality A/B · 48 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1764C
BFW CONDENSER
A420.65
PX_PCV-1992
BY PASS DUCT
C1200.08
PX_ROF-916
MP STEAM TO VD-708
C1200.00
PX_KT-264A
TURBINE FOR KC-264A
S442.39
PX_KT-624A
TURBINE FOR KC-624A
S1632.39

Lead time and procurement

Lead time 19 ± 15 days (PO history + category, 1 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
01 Feb 2026PR03
Regular replenishment
3Rp 10,54609 Feb 20268 d

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
26 Dec 2026PX_KT-264ATurbine major overhaul2.86

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
23 Dec 2025MediumPX_HE-1764CCleaning HE-1764C
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A
29 May 2025LowPX_HE-1764CInstall scaffolding at HE-1764C

Recent goods issues

Posting dateQtyOrderOrder type
23 Aug 20254201000039859Corrective
23 Aug 202512201000039859Corrective