STUDBOLT,7/8INX70MM,B8M/8M
Material 4100026671 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalBelow reorder point
- Material
- 4100026671
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B, 2 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 44 EA/year: 44 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~23 days; expected demand during lead time 2.8.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 108.
- 5.On hand 26 + on order 0 is at or below the reorder point: order 82 now.
- 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
82 EA
Rp 3.1M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
26 / 0
no open PO
Today Min / Max
9 / 16
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 52
Rec. Max
108
order qty 54
Service level
99.9%
stockout risk now 5%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 125 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 175.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
1 with criticality A/B · 60 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-819 FUEL OIL CONDENSER | A | 20 | 0 | 0.22 |
| PX_PRV-1439D SAFETY VALVE KC-372D | S | 16 | 0 | 0.04 |
| PX_PRV-386C SAFETY VALVE PP-888A | S | 24 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 May 2026 | 96 | 201000003975 | Corrective |
| 30 Nov 2025 | 12 | 201000035388 | Corrective |