STUDBOLT,7/8INX70MM,B8M/8M

Material 4100026671 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalBelow reorder point
Material
4100026671
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B, 2 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 2 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 44 EA/year: 44 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 2.8.
  • 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 54, order up to 108.
  • 5.On hand 26 + on order 0 is at or below the reorder point: order 82 now.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
82 EA
Rp 3.1M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
26 / 0
no open PO
Today Min / Max
9 / 16
static parameters in BoM
Rec. Min (reorder point)
54
safety stock 52
Rec. Max
108
order qty 54
Service level
99.9%
stockout risk now 5%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 125 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 175.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

1 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-819
FUEL OIL CONDENSER
A2000.22
PX_PRV-1439D
SAFETY VALVE KC-372D
S1600.04
PX_PRV-386C
SAFETY VALVE PP-888A
S2400.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
29 May 202696201000003975Corrective
30 Nov 202512201000035388Corrective