STUDBOLT,1INX60MM,B8M/8M
Material 4100026692 · STUDBOLT · Plant 1000
ASafety-criticalMaintainHealthy
- Material
- 4100026692
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- RAJAWALI INSTRUMEN INTERNASIONAL PT
- Lead time
- 23 d · P80 31 d
- Unit price
- Rp 13,531
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 33 EA/year: 33 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~23 days; expected demand during lead time 2.0.
- 4.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 46, order up to 92.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 6.ML early warning: 35% probability of demand in the next 90 days.
Safety-critical (SCE)ML early warningSingle source
On hand / on order
89 / 0
no open PO
Today Min / Max
25 / 45
static parameters in BoM
Rec. Min (reorder point)
46
safety stock 44
Rec. Max
92
order qty 46
Service level
99.9%
stockout risk now 0%
Unit price
Rp 13,531
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 165 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 151.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 2 functional locations
1 with criticality A/B · 20 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_PP-1063 METHANE PUMP | A | 4 | 0 | 0.19 |
| PX_PRV-1919 SAFETY VALVE HE-1181C | S | 16 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 13 days (PO history, 4 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 05 Aug 2026 | PR03 Regular replenishment | 42 | Rp 13,862 | 31 Aug 2026 | 26 d |
| 21 Mar 2026 | PR03 Regular replenishment | 19 | Rp 13,748 | 08 Apr 2026 | 18 d |
| 11 Jan 2026 | PR06 Regular replenishment | 33 | Rp 13,079 | 20 Jan 2026 | 9 d |
| 26 May 2025 | PR03 Regular replenishment | 39 | Rp 13,313 | 03 Jul 2025 | 38 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 19 Apr 2026 | 12 | 205000007469 | Other maintenance |
| 03 Nov 2025 | 48 | 201000030637 | Corrective |
| 03 Nov 2025 | 8 | 201000030637 | Corrective |
| 03 Nov 2025 | 24 | 201000030637 | Corrective |