STUDBOLT,5/8INX35MM,B8M/8M
Material 4100026719 · STUDBOLT · Plant 1000
CSafety-criticalReorderNormalCritical insurance spare
- Material
- 4100026719
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s) (equipment criticality C). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 9.8 EA/year: 1.2 unplanned (installed-base failure prior (no history)) + 8.6 from the maintenance plan.
- 3.Lead time ~23 days; expected demand during lead time 0.1.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
- 5.On hand 15 + on order 0 is at or below the reorder point: order 39 now.
- 6.No issue in 17 months, but it protects critical equipment: keep it.
Proposed purchase requisition
39 EA
Rp 1.5M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
15 / 0
no open PO
Today Min / Max
4 / 10
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 2 functional locations
0 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-376A QUENCH OIL PUMP | C | 12 | 1 | 0.62 |
| PX_PRV-1734D SAFETY VALVE KC-551D | S | 12 | 2 | 0.47 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 02 Feb 2027 | PX_PP-376A | Pump overhaul | 8.59 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 14 Mar 2026 | Medium | PX_PRV-1734D | Leak from packing |
| 24 Jun 2025 | Low | PX_PP-376A | PP-376A seal leak |
| 22 May 2025 | Low | PX_PRV-1734D | PSM25/PRV-1734D simmering |
Recent goods issues
Never issued in the 17-month history.