STUDBOLT,1/2INX105MM,B7/2H
Material 4100026834 · STUDBOLT · Plant 1000
BMonitorCritical insurance spare
- Material
- 4100026834
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 0.8 EA/year: 0.8 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 0.0.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
99.8%
stockout risk now 0%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.
Installed on 2 functional locations
2 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-554 CHARGE GAS TLE | B | 20 | 2 | 0.65 |
| PX_PCV-155 PRESSURE CONTROL VALVE | B | 4 | 0 | 0.08 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 13 Sept 2026 | Medium | PX_HE-554 | Cleaning HE-554 |
| 04 May 2025 | Medium | PX_HE-554 | Install scaffolding at HE-554 |
Recent goods issues
Never issued in the 17-month history.