STUDBOLT,5/8INX70MM,B8M/8M
Material 4100026836 · STUDBOLT · Plant 1000
BMonitorCritical insurance spare
- Material
- 4100026836
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 13 EA/year: 13 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 0.8.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 3%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 26.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.
Installed on 3 functional locations
1 with criticality A/B · 60 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PCV-1356A PRESSURE CONTROL VALVE | B | 24 | 1 | 0.51 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 16 | 23 | 9.44 |
| PX_KC-264A C4 PRODUCT FAN | S | 20 | 5 | 1.85 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 12 Aug 2026 | Medium | PX_BF-108 | Peep door broken BF-108 |
| 27 Jul 2026 | Low | PX_BF-108 | Cleaning burner BF-108 |
| 12 Jul 2026 | Low | PX_KC-264A | Leak from packing |
| 04 Jul 2026 | High | PX_BF-108 | Install scaffolding at BF-108 |
| 04 Jul 2026 | Medium | PX_BF-108 | Leak from packing |
| 16 Jun 2026 | High | PX_BF-108 | Leak from packing |
Recent goods issues
Never issued in the 17-month history.