STUDBOLT,5/8INX70MM,B8M/8M

Material 4100026836 · STUDBOLT · Plant 1000

BMonitorCritical insurance spare
Material
4100026836
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 13 EA/year: 13 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 0.8.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
5 / 8
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 3%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 26.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~10 days.

Installed on 3 functional locations

1 with criticality A/B · 60 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PCV-1356A
PRESSURE CONTROL VALVE
B2410.51
PX_BF-108
CRACKING FURNACE BF-108
S16239.44
PX_KC-264A
C4 PRODUCT FAN
S2051.85

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
10 Sept 2026MediumPX_BF-108[MSI-B-26-JJB-193] Permanent repair
07 Sept 2026MediumPX_BF-108Leak from packing
12 Aug 2026MediumPX_BF-108Peep door broken BF-108
27 Jul 2026LowPX_BF-108Cleaning burner BF-108
12 Jul 2026LowPX_KC-264ALeak from packing
04 Jul 2026HighPX_BF-108Install scaffolding at BF-108
04 Jul 2026MediumPX_BF-108Leak from packing
16 Jun 2026HighPX_BF-108Leak from packing

Recent goods issues

Never issued in the 17-month history.