STUDBOLT,1/2INX75MM,B8M/8M
Material 4100026910 · STUDBOLT · Plant 1000
CMonitorPotentially obsolete
- Material
- 4100026910
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 9.3 EA/year: 9.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~23 days; expected demand during lead time 0.6.
- 3.A 97.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
Price estimatedLead time estimated
On hand / on order
7 / 0
no open PO
Today Min / Max
3 / 9
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
97.8%
stockout risk now 2%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 7 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.
Installed on 2 functional locations
0 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1772B SLOP OIL PREHEATER | C | 8 | 0 | 0.22 |
| PX_KC-843 FUEL OIL COMPRESSOR | S | 16 | 21 | 8.28 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_KC-843 | Painting KC-843 |
| 16 Sept 2026 | Low | PX_KC-843 | Inspect coupling KC-843 |
| 29 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_KC-843 | [MSI-B-26-RLH-211] Permanent repair |
| 14 Aug 2026 | Medium | PX_KC-843 | KC-843 lube oil filter DP high |
| 06 Aug 2026 | Medium | PX_KC-843 | Replace lamp as per PM finding |
| 02 Aug 2026 | Emergency | PX_KC-843 | [MSI-B-26-KRX-321] Permanent repair |
| 14 Jul 2026 | Medium | PX_KC-843 | KC-843 bearing temp high |
| 09 Jun 2026 | Low | PX_KC-843 | Overhaul |
| 20 May 2026 | Medium | PX_KC-843 | Leak from packing |
Recent goods issues
Never issued in the 17-month history.