STUDBOLT,1/2INX60MM,B8M/8M

Material 4100026963 · STUDBOLT · Plant 1000

AReorderNormalSlow-moving
Material
4100026963
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
24 d · P80 32 d
Unit price
Rp 15,306

Recommendation

  • 1.Forecast 12 EA/year: 12 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.8.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 44, order up to 88.
  • 4.On hand 12 + on order 0 is at or below the reorder point: order 76 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.ML early warning: 32% probability of demand in the next 90 days.
Proposed purchase requisition
76 EA
Rp 1.2M · order by 01 Oct 2026
Expected arrival ≈ 24 days
ML early warningSingle source
On hand / on order
12 / 0
no open PO
Today Min / Max
8 / 15
static parameters in BoM
Rec. Min (reorder point)
44
safety stock 44
Rec. Max
88
order qty 44
Service level
100.0%
stockout risk now 2%
Unit price
Rp 15,306
PO history
ML early warning: 32% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 274 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 60.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 24 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LCV-303
VD-1035D LEVEL CONTROL
A400.12
PY_PP-1063
METHANE PUMP
A400.19
PX_10-MS-16802-C11A-HS
PIPE-10 FROM PP-1865A TO HE-1603
C1600.01

Lead time and procurement

Lead time 24 ± 14 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
18 Aug 2026PR06
Regular replenishment
14Rp 15,30627 Sept 202640 d
17 Jul 2026PR03
Regular replenishment
13Rp 15,58031 Jul 202614 d
11 Jul 2025PR03
Regular replenishment
8Rp 15,02531 Jul 202520 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
31 Dec 202532201000033177Corrective
31 Dec 202512201000033177Corrective