STUDBOLT,1/2INX115MM,B7/2H
Material 4100026971 · STUDBOLT · Plant 1000
ASafety-criticalReorderNormalSlow-moving
- Material
- 4100026971
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B, 1 safety/shutdown valve)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
- 2.Forecast 19 EA/year: 19 unplanned (credibility blend: own history + installed-base prior).
- 3.Lead time ~23 days; expected demand during lead time 1.2.
- 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 80.
- 5.On hand 2 + on order 0 is at or below the reorder point: order 78 now.
- 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
78 EA
Rp 2.9M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 39
Rec. Max
80
order qty 40
Service level
100.0%
stockout risk now 3%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 301 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 103.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 2 functional locations
1 with criticality A/B · 32 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-336A RICH AMINE PUMP | A | 24 | 2 | 1.05 |
| PX_PRV-916 SAFETY VALVE HE-118B | S | 8 | 0 | 0.04 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Dec 2025 | Low | PX_PP-336A | Oil leak at PP-336A bearing housing |
| 11 Aug 2025 | Medium | PX_PP-336A | Replace bearing PP-336A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Dec 2025 | 32 | 201000002031 | Corrective |
| 04 Dec 2025 | 8 | 201000002031 | Corrective |