Sparely
DU

STUDBOLT,3/4INX110MM,B16/4

Material 4100026990 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalSlow-moving
Material
4100026990
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 135 EA/year: 135 unplanned (credibility blend: own history + installed-base prior).
  • 3.Lead time ~23 days; expected demand during lead time 8.5.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 108, order up to 244.
  • 5.On hand 18 + on order 0 is at or below the reorder point: order 226 now.
  • 6.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
226 EA
Rp 8.5M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
18 / 0
no open PO
Today Min / Max
16 / 42
static parameters in BoM
Rec. Min (reorder point)
108
safety stock 100
Rec. Max
244
order qty 136
Service level
100.0%
stockout risk now 21%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 241 days ago, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 807.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 5 functional locations

4 with criticality A/B · 68 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A202911.58
PX_KC-886D
BOTTOM FAN
B1241.43
PX_PP-1905A
FLUSHING OIL PUMP
B1641.47
PX_HE-1188D
INHIBITOR REBOILER
B1600.22
PX_PRV-1201
SAFETY VALVE HE-1502B
S400.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_KC-886DKC-886D high vibration
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
06 Aug 2026MediumPX_PP-1905APP-1905A abnormal noise
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
10 Jul 2026MediumPX_KC-886DInstall scaffolding at KC-886D
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109

Recent goods issues

Posting dateQtyOrderOrder type
02 Feb 202624201000032240Corrective
24 Dec 202548201000037858Corrective