STUDBOLT,1INX115MM,B8M/8M
Material 4100027029 · STUDBOLT · Plant 1000
AReorderCriticalBelow reorder point
- Material
- 4100027029
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 116 EA/year: 99 unplanned (credibility blend: own history + installed-base prior) + 17 from the maintenance plan.
- 2.Lead time ~23 days; expected demand during lead time 6.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 104, order up to 220.
- 4.On hand 4 + on order 0 is at or below the reorder point: order 216 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
216 EA
Rp 8.2M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
3 / 5
static parameters in BoM
Rec. Min (reorder point)
104
safety stock 98
Rec. Max
220
order qty 116
Service level
100.0%
stockout risk now 11%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 144 days ago, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 407.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 3 functional locations
2 with criticality A/B · 40 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-732D METHANOL COMPRESSOR | A | 8 | 6 | 3.14 |
| PX_1-BF-1203-A51A-T PIPE-1 FROM VD-1305A TO PP-251C | B | 8 | 0 | 0.01 |
| PX_KT-264A TURBINE FOR KC-264A | S | 24 | 4 | 2.39 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 26 Dec 2026 | PX_KT-264A | Turbine major overhaul | 17.2 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Jul 2026 | Medium | PX_KC-732D | KC-732D bearing temp high |
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 24 Dec 2025 | Medium | PX_KC-732D | Inspect coupling KC-732D |
| 17 Nov 2025 | Medium | PX_KC-732D | Overhaul |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 27 Sept 2025 | Medium | PX_KC-732D | Install cover plate for MCP cracking |
| 09 Sept 2025 | Medium | PX_KC-732D | Leak from packing |
| 17 Jul 2025 | Low | PX_KC-732D | KC-732D lube oil filter DP high |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 May 2026 | 4 | 201000027355 | Corrective |
| 10 May 2026 | 48 | 201000027355 | Corrective |