STUDBOLT,5/8INX65MM,B16/4

Material 4100027176 · STUDBOLT · Plant 1000

CMonitorPotentially obsolete
Material
4100027176
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 3.1 EA/year: 3.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 0.2.
  • 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 27.
Price estimatedLead time estimated
On hand / on order
8 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
27
order qty 27
Service level
99.3%
stockout risk now 1%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 635,767/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 2 functional locations

0 with criticality A/B · 32 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_2-FG-20536-A11A-H
PIPE-2 FROM VD-1731C TO HE-1690C
C1610.44
PX_KT-624A
TURBINE FOR KC-624A
S1632.39

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
19 Aug 2025MediumPX_2-FG-20536-A11A-HRepair insulation 2-FG-20536-A11A-H
17 Jun 2025MediumPX_KT-624A[MSI-B-25-SWV-127/M] Replace line

Recent goods issues

Never issued in the 17-month history.