STUDBOLT,1INX75MM,B16/4

Material 4100027412 · STUDBOLT · Plant 1000

CReduceExcess
Material
4100027412
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
GEMILANG LOGAM MAKMUR PT
Lead time
26 d · P80 35 d
Unit price
Rp 12,249

Recommendation

  • 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 0.8.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 20.
  • 4.Stock 73 exceeds the level to keep (20) by 53.
Single source
On hand / on order
73 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
20
order qty 12
Service level
99.5%
stockout risk now 0%
Unit price
Rp 12,249
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 84 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.

Installed on 3 functional locations

0 with criticality A/B · 40 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_HE-1205B
SEAL OIL TLE
C462.36
PX_TCV-594
BF-101 TEMP CONTROL
C1600.12
PX_KT-875
TURBINE FOR KC-875
S2001.10

Lead time and procurement

Lead time 26 ± 12 days (PO history, 3 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
15 Jun 2026PR06
Regular replenishment
2Rp 12,24924 Jul 202639 d
11 Mar 2026PR03
Regular replenishment
3Rp 12,13131 Mar 202620 d
22 Jun 2025PR03
Regular replenishment
1Rp 13,04022 Jul 202530 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Sept 2026LowPY_HE-1205BLeak from packing
02 Aug 2026LowPY_HE-1205BRetubing HE-1205B
20 Jul 2026LowPY_HE-1205BReplace lamp as per PM finding
11 Nov 2025MediumPY_HE-1205BHE-1205B tube leak
10 Nov 2025LowPY_HE-1205BReplace lamp as per PM finding
27 May 2025LowPY_HE-1205BReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
09 Jul 20268201000002156Corrective