STUDBOLT,1INX75MM,B16/4
Material 4100027412 · STUDBOLT · Plant 1000
CReduceExcess
- Material
- 4100027412
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- GEMILANG LOGAM MAKMUR PT
- Lead time
- 26 d · P80 35 d
- Unit price
- Rp 12,249
Recommendation
- 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~26 days; expected demand during lead time 0.8.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 20.
- 4.Stock 73 exceeds the level to keep (20) by 53.
Single source
On hand / on order
73 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
20
order qty 12
Service level
99.5%
stockout risk now 0%
Unit price
Rp 12,249
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 84 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~10 days.
Installed on 3 functional locations
0 with criticality A/B · 40 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_HE-1205B SEAL OIL TLE | C | 4 | 6 | 2.36 |
| PX_TCV-594 BF-101 TEMP CONTROL | C | 16 | 0 | 0.12 |
| PX_KT-875 TURBINE FOR KC-875 | S | 20 | 0 | 1.10 |
Lead time and procurement
Lead time 26 ± 12 days (PO history, 3 PO lines) · on-time 41%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Jun 2026 | PR06 Regular replenishment | 2 | Rp 12,249 | 24 Jul 2026 | 39 d |
| 11 Mar 2026 | PR03 Regular replenishment | 3 | Rp 12,131 | 31 Mar 2026 | 20 d |
| 22 Jun 2025 | PR03 Regular replenishment | 1 | Rp 13,040 | 22 Jul 2025 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | Low | PY_HE-1205B | Leak from packing |
| 02 Aug 2026 | Low | PY_HE-1205B | Retubing HE-1205B |
| 20 Jul 2026 | Low | PY_HE-1205B | Replace lamp as per PM finding |
| 11 Nov 2025 | Medium | PY_HE-1205B | HE-1205B tube leak |
| 10 Nov 2025 | Low | PY_HE-1205B | Replace lamp as per PM finding |
| 27 May 2025 | Low | PY_HE-1205B | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jul 2026 | 8 | 201000002156 | Corrective |