STUDBOLT,1INX95MM,B7/2H
Material 4100027510 · STUDBOLT · Plant 1000
- Material
- 4100027510
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 23 EA/year: 23 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 1.4.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 60, order up to 120.
- 4.On hand 18 + on order 0 is at or below the reorder point: order 102 now.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 81.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 2 functional locations
1 with criticality A/B · 36 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PY_LCV-1331 HE-1133B LEVEL CONTROL | A | 24 | 0 | 0.12 |
| PX_HE-287 CAUSTIC REBOILER | C | 12 | 0 | 0.22 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Apr 2026 | 48 | 201000014761 | Corrective |
| 16 Apr 2026 | 12 | 201000014761 | Corrective |