STUDBOLT,3/4INX65MM,B16/4
Material 4100027599 · STUDBOLT · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100027599
- Category
- STUDBOLT
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 23 d · P80 39 d
- Unit price
- Rp 37,807 (est.)
Recommendation
- 1.Forecast 98 EA/year: 89 unplanned (credibility blend: own history + installed-base prior) + 8.6 from the maintenance plan.
- 2.Lead time ~23 days; expected demand during lead time 5.6.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 32, order up to 130.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 125 now.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
125 EA
Rp 4.7M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
32
safety stock 27
Rec. Max
130
order qty 98
Service level
99.9%
stockout risk now 51%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 370 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.
Installed on 5 functional locations
4 with criticality A/B · 56 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 8 | 82 | 30.86 |
| PX_HE-439C LUBE OIL REBOILER | A | 4 | 0 | 0.22 |
| PX_KC-620A DEMIN WATER AIR COMPRESSOR | B | 12 | 2 | 1.00 |
| PX_HE-213B INHIBITOR COOLER | B | 24 | 0 | 0.22 |
| PX_KT-447 TURBINE FOR KC-447 | S | 8 | 13 | 6.24 |
Lead time and procurement
Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 01 Aug 2027 | PX_KC-620A | Compressor major overhaul | 8.59 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
| 08 Sept 2026 | Medium | PX_BF-106 | Painting BF-106 |
| 03 Sept 2026 | Medium | PX_BF-106 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2025 | 8 | 201000030196 | Corrective |