Sparely
DU

STUDBOLT,1INX75MM,B8M/8M

Material 4100027642 · STUDBOLT · Plant 1000

ASafety-criticalReorderNormalCritical insurance spare
Material
4100027642
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B, 1 safety/shutdown valve)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Safety-critical element: installed on 1 safety or shutdown valve location(s). Downtime risk is costed as class A and at least 1 spare is always kept; any reduction needs Management sign-off.
  • 2.Forecast 13 EA/year: 13 unplanned (installed-base failure prior (no history)).
  • 3.Lead time ~23 days; expected demand during lead time 0.8.
  • 4.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
  • 5.On hand 10 + on order 0 is at or below the reorder point: order 44 now.
  • 6.No issue in 17 months, but it protects critical equipment: keep it.
  • 7.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
44 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Safety-critical (SCE)Price estimatedLead time estimated
On hand / on order
10 / 0
no open PO
Today Min / Max
5 / 14
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 3%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 104.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

2 with criticality A/B · 52 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-107
CRACKING FURNACE BF-107
A16239.01
PX_KT-856A
TURBINE FOR KC-856A
A1272.81
PX_PRV-1510
SAFETY VALVE PP-1782B
S2400.04

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
15 Aug 2026MediumPX_BF-107Hot spot at convection BF-107
08 Aug 2026LowPX_BF-107Cleaning burner BF-107
21 Jul 2026MediumPX_BF-107Replace lamp as per PM finding
21 Jul 2026MediumPX_BF-107Thermograph wall BF-107
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
18 Jul 2026EmergencyPX_BF-107Hot spot at convection BF-107
10 Jul 2026MediumPX_BF-107Hot spot at convection BF-107
12 Apr 2026MediumPX_BF-107Decoking follow up BF-107

Recent goods issues

Never issued in the 17-month history.

Sparely