Sparely
DU

STUDBOLT,1/2INX105MM,B8M/8M

Material 4100027678 · STUDBOLT · Plant 1000

AReorderNormalBelow reorder point
Material
4100027678
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 25 EA/year: 25 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 1.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 48, order up to 74.
  • 4.On hand 12 + on order 0 is at or below the reorder point: order 62 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
62 EA
Rp 2.3M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
3 / 9
static parameters in BoM
Rec. Min (reorder point)
48
safety stock 47
Rec. Max
74
order qty 26
Service level
100.0%
stockout risk now 6%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 124 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 225.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 2 functional locations

2 with criticality A/B · 24 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-588
CAUSTIC FAN
A1221.00
PX_HE-632B
RECYCLE ETHANE TLE
B1220.65

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
22 Feb 2026MediumPX_KC-588KC-588 lube oil filter DP high
09 Dec 2025HighPX_HE-632BHE-632B tube leak
24 May 2025LowPX_HE-632BInstall scaffolding at HE-632B
24 May 2025MediumPX_KC-588Repair insulation KC-588

Recent goods issues

Posting dateQtyOrderOrder type
30 May 202616201000036988Corrective
20 Sept 202532201000012447Corrective