STUDBOLT,5/8INX50MM,B8M/8M

Material 4100027700 · STUDBOLT · Plant 1000

AMonitorCritical insurance spare
Material
4100027700
Category
STUDBOLT
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
23 d · P80 39 d
Unit price
Rp 37,807 (est.)

Recommendation

  • 1.Forecast 9.0 EA/year: 9.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~23 days; expected demand during lead time 0.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 54.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 27
Rec. Max
54
order qty 27
Service level
100.0%
stockout risk now 2%
Unit price
Rp 37,807
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 72.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~10 days.

Installed on 3 functional locations

1 with criticality A/B · 36 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A472.81
PX_BF-101
CRACKING FURNACE BF-101
S1683.02
PX_KT-624A
TURBINE FOR KC-624A
S1632.39

Lead time and procurement

Lead time 23 ± 15 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
07 Feb 2026MediumPX_KT-624AReplace lamp as per PM finding
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting

Recent goods issues

Never issued in the 17-month history.