PIPE,1/2IN,STD,P11,SMLS,6M LG
Material 4100027753 · PIPE · Plant 1000
AReduceExcess
- Material
- 4100027753
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (20 of 42 FuncLocs A/B)
- Supplier
- SURYA INSTRUMEN MAKMUR PT
- Lead time
- 36 d · P80 49 d
- Unit price
- Rp 1.7M
Recommendation
- 1.Forecast 182 LG/year: 182 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~36 days; expected demand during lead time 18.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 62, order up to 102.
- 4.Stock 254 exceeds the level to keep (120) by 134; the level includes the 120 used in the last turnaround.
- 5.Installed on 42 FuncLoc(s), 20 of them criticality A/B.
- 6.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 120Single sourceAbnormal consumptionOpen PO
On hand / on order
254 / 232
next delivery 30 Oct 2026
Today Min / Max
144 / 222
static parameters in BoM
Rec. Min (reorder point)
62
safety stock 45
Rec. Max
102
order qty 40
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.7M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 16 issue days in the last 180 days, last issue 9 days ago, 73 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 7 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (165 units) excluded from the baseline.
Demand pattern Erratic · 80 issue days · 3 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 13.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 42 functional locations
20 with criticality A/B · 197 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 12 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 6 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 6 | 71 | 28.72 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 12 | 28 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 6 | 23 | 9.01 |
| PX_HE-1660A REFLUX CONDENSER | A | 3 | 5 | 2.36 |
| PY_HE-1907A METHANE TLE | A | 1 | 3 | 1.08 |
| PY_HE-442C WASH WATER REBOILER | A | 1 | 1 | 0.22 |
| PX_HE-1229B DILUTION STEAM REBOILER | A | 1 | 0 | 0.22 |
| PX_HE-1701B QUENCH OIL COOLER | A | 12 | 0 | 0.22 |
| PX_HE-771A COOLING WATER CONDENSER | B | 2 | 7 | 2.79 |
| PX_1-HS-12320-A11A-C PIPE-1 FROM HE-1061B TO HE-611D | B | 6 | 3 | 0.44 |
Lead time and procurement
Lead time 36 ± 18 days (PO history, 23 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Sept 2026 | PR03 Regular replenishment | 232 | Rp 1.7M | 30 Oct 2026 open | 46 d |
| 03 Aug 2026 | PR03 Regular replenishment | 113 | Rp 1.7M | 23 Sept 2026 | 51 d |
| 03 Jun 2026 | PR03 Regular replenishment | 218 | Rp 1.7M | 12 Jul 2026 | 39 d |
| 29 May 2026 | PR06 Regular replenishment | 135 | Rp 1.8M | 02 Jul 2026 | 34 d |
| 03 May 2026 | PR01 Import / long-lead | 81 | Rp 1.8M | 16 Jul 2026 | 74 d |
| 02 May 2026 | PR03 Regular replenishment | 170 | Rp 1.6M | 23 May 2026 | 21 d |
| 05 Apr 2026 | PR03 Regular replenishment | 179 | Rp 1.7M | 04 May 2026 | 29 d |
| 31 Mar 2026 | PR04 Regular (other) | 112 | Rp 1.7M | 26 May 2026 | 56 d |
| 30 Mar 2026 | PR03 Regular replenishment | 129 | Rp 1.7M | 13 Apr 2026 | 14 d |
| 12 Mar 2026 | PR06 Regular replenishment | 202 | Rp 1.8M | 04 Apr 2026 | 23 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 28 Sept 2026 | Medium | PX_HE-771A | Retubing HE-771A |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Sept 2026 | 9 | 203000034378 | Turnaround |
| 22 Sept 2026 | 1 | 201000025766 | Corrective |
| 18 Sept 2026 | 6 | 209000036917 | Other maintenance |
| 01 Sept 2026 | 2 | 201000010492 | Corrective |
| 12 Aug 2026 | 1 | 201000022527 | Corrective |
| 09 Aug 2026 | 1 | 201000006061 | Corrective |
| 04 Aug 2026 | 1 | 201000010969 | Corrective |
| 27 Jul 2026 | 4 | 201000029643 | Corrective |
| 26 Jul 2026 | 2 | 201000024842 | Corrective |
| 26 Jul 2026 | 3 | 201000029643 | Corrective |
| 07 Jul 2026 | 3 | 209000029244 | Other maintenance |
| 01 Jul 2026 | 1 | 201000022451 | Corrective |
| 23 Jun 2026 | 3 | 209000014083 | Other maintenance |
| 22 Jun 2026 | 6 | 209000014083 | Other maintenance |
| 18 Jun 2026 | 7 | 201000024332 | Corrective |