PIPE,2IN,STD,CS,SMLS,6M LG

Material 4100027779 · PIPE · Plant 1000

AMaintainHealthy
Material
4100027779
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (11 of 21 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA INTERNASIONAL PT
Lead time
40 d · P80 53 d
Unit price
Rp 5.1M

Recommendation

  • 1.Forecast 117 LG/year: 117 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~40 days; expected demand during lead time 13.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 47, order up to 66.
  • 4.Installed on 21 FuncLoc(s), 11 of them criticality A/B.
  • 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 51Single sourceOpen PO
On hand / on order
27 / 89
next delivery 12 Oct 2026
Today Min / Max
22 / 36
static parameters in BoM
Rec. Min (reorder point)
47
safety stock 35
Rec. Max
66
order qty 19
Service level
99.9%
stockout risk now 0%
Unit price
Rp 5.1M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 12 issue days in the last 180 days, last issue 10 days ago, 19 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 11 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (51 units) excluded from the baseline.

Demand pattern Erratic · 60 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 21 functional locations

11 with criticality A/B · 101 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-104
CRACKING FURNACE BF-104
A122811.58
PX_BF-107
CRACKING FURNACE BF-107
A12239.01
PX_HE-1660A
REFLUX CONDENSER
A152.36
PX_3/4-P-10242-A51A-T
PIPE-3/4 FROM PP-1407B TO BF-104
A200.01
PX_HE-1108C
INHIBITOR TLE
A100.22
PX_HE-1564C
DILUTION STEAM TLE
A100.22
PX_HE-605
WASH WATER EXCHANGER
A300.22
PX_HE-895B
DEMIN WATER EXCHANGER
A100.22
PX_1-DS-10611-B22A-C
PIPE-1 FROM VD-255 TO HE-1913
B1200.01
PX_HE-1316C
QUENCH WATER COOLER
B100.22
PY_HE-228
WASH WATER EXCHANGER
B100.22
PX_HE-1396C
PROPYLENE TLE
C1272.79

Lead time and procurement

Lead time 40 ± 24 days (PO history, 24 PO lines) · on-time 41%

PR dateTypeQtyUnit priceDeliveryLead time
11 Sept 2026PR03
Regular replenishment
89Rp 5.0M12 Oct 2026
open
31 d
11 Aug 2026PR04
Regular (other)
108Rp 5.0M27 Sept 202647 d
29 Jul 2026PR06
Regular replenishment
81Rp 5.0M13 Aug 202615 d
24 Jul 2026PR03
Regular replenishment
96Rp 4.9M16 Aug 202623 d
07 Jul 2026PR03
Regular replenishment
82Rp 5.2M21 Aug 202645 d
28 Jun 2026PR06
Regular replenishment
31Rp 5.0M26 Jul 202628 d
26 Jun 2026PR03
Regular replenishment
66Rp 5.3M26 Aug 202661 d
24 Jun 2026PR03
Regular replenishment
107Rp 5.4M28 Jul 202634 d
15 Jun 2026PR03
Regular replenishment
116Rp 5.0M10 Jul 202625 d
13 Jun 2026PR03
Regular replenishment
95Rp 5.0M13 Jul 202630 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
17 Sept 2026MediumPX_HE-1396C[MSI-B-26-NWH-385] Permanent repair
16 Sept 2026MediumPX_BF-104Hot spot at convection BF-104
15 Sept 2026EmergencyPX_HE-1660A[MSI-B-26-ZCD-129] Permanent repair
13 Sept 2026LowPX_BF-104Install cover plate for MCP cracking
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
04 Sept 2026MediumPX_BF-104Replace burner tip BF-104
01 Sept 2026MediumPX_BF-104Install scaffolding at BF-104
29 Aug 2026HighPX_BF-104Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20264202000000410Emergency
13 Aug 20261201000004047Corrective
16 Jul 20261201000020061Corrective
10 Jul 20261201000026179Corrective
30 Jun 20266201000011220Corrective
29 Jun 20262201000016139Corrective
24 Jun 20263209000014083Other maintenance
19 Jun 20266209000016742Other maintenance
30 Apr 20265201000004547Corrective
30 Apr 20261201000025884Corrective
24 Apr 20262204000001034Preventive
17 Apr 20266209000024091Other maintenance
15 Apr 20263201000000507Corrective
21 Mar 20261201000035543Corrective
28 Feb 20261201000013980Corrective