PIPE,3/4IN,SCH160,CS,SMLS,6M LG
Material 4100027811 · PIPE · Plant 1000
AMonitorHealthy
- Material
- 4100027811
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (8 of 17 FuncLocs A/B)
- Supplier
- SAMUDRA SEJAHTERA PERSADA PT
- Lead time
- 44 d · P80 58 d
- Unit price
- Rp 1.1M
Recommendation
- 1.Forecast 79 LG/year: 79 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~44 days; expected demand during lead time 9.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 37, order up to 70.
- 4.Installed on 17 FuncLoc(s), 8 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 54Single sourceAbnormal consumptionOpen PO
On hand / on order
26 / 171
next delivery 07 Oct 2026
Today Min / Max
24 / 37
static parameters in BoM
Rec. Min (reorder point)
37
safety stock 28
Rec. Max
70
order qty 33
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.1M
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 13 issue days in the last 180 days, last issue 1 days ago, 33 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 7 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (84 units) excluded from the baseline.
Demand pattern Smooth · 34 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 17 functional locations
8 with criticality A/B · 76 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-102 CRACKING FURNACE BF-102 | A | 3 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 12 | 38 | 14.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
| PX_HE-1903 RICH AMINE CONDENSER | A | 6 | 2 | 1.08 |
| PY_HE-785C C3 RECYCLE COOLER | A | 3 | 0 | 0.22 |
| PX_HE-779D FEED PREHEATER | B | 2 | 1 | 0.22 |
| PY_HE-1685D QUENCH OIL CONDENSER | B | 3 | 1 | 0.65 |
| PX_1-MS-14835-B22A-H PIPE-1 FROM KC-588 TO VD-295 | B | 1 | 0 | 0.01 |
| PX_1-1/2-P-1887-A11A PIPE-1-1/2 FROM PP-1202 TO HE-1201C | C | 3 | 4 | 1.30 |
| PX_3/4-LS-2770-D12A-H PIPE-3/4 FROM PP-207 TO VD-185 | C | 3 | 1 | 0.01 |
| PX_1-1/2-HS-11650-A11A-C PIPE-1-1/2 FROM VD-1001 TO BF-105 | C | 12 | 0 | 0.01 |
| PX_1-QO-23198-A51A-C PIPE-1 FROM PP-1171 TO PP-1115 | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 44 ± 25 days (PO history, 16 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Sept 2026 | PR03 Regular replenishment | 91 | Rp 1.1M | 13 Jan 2027 open | 115 d |
| 11 Sept 2026 | PR06 Regular replenishment | 27 | Rp 1.1M | 22 Oct 2026 open | 41 d |
| 17 Jul 2026 | PR05 Project / turnaround | 53 | Rp 1.1M | 07 Oct 2026 open | 82 d |
| 03 Jul 2026 | PR03 Regular replenishment | 29 | Rp 1.2M | 02 Aug 2026 | 30 d |
| 28 Jun 2026 | PR03 Regular replenishment | 49 | Rp 1.1M | 31 Jul 2026 | 33 d |
| 21 May 2026 | PR03 Regular replenishment | 51 | Rp 1.1M | 06 Jun 2026 | 16 d |
| 19 Apr 2026 | PR06 Regular replenishment | 87 | Rp 1.2M | 12 May 2026 | 23 d |
| 18 Feb 2026 | PR06 Regular replenishment | 54 | Rp 1.1M | 27 Mar 2026 | 37 d |
| 29 Jan 2026 | PR06 Regular replenishment | 81 | Rp 1.2M | 27 Feb 2026 | 29 d |
| 05 Jan 2026 | PR03 Regular replenishment | 78 | Rp 1.1M | 25 Jan 2026 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 18 Sept 2026 | Medium | PX_1-1/2-P-1887-A11A | [MSI-B-26-HXB-137] Permanent repair |
| 17 Sept 2026 | Emergency | PX_1-1/2-P-1887-A11A | Install scaffolding at 1-1/2-P-1887-A11A |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 10 Sept 2026 | Medium | PX_BF-111 | Peep door broken BF-111 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 4 | 201000015377 | Corrective |
| 20 Sept 2026 | 1 | 201000013046 | Corrective |
| 15 Sept 2026 | 4 | 201000001079 | Corrective |
| 03 Sept 2026 | 10 | 201000031484 | Corrective |
| 21 Aug 2026 | 1 | 204000030403 | Preventive |
| 13 Aug 2026 | 10 | 204000031269 | Preventive |
| 24 Jul 2026 | 6 | 203000004330 | Turnaround |
| 12 Jul 2026 | 1 | 205000005774 | Other maintenance |
| 05 Jul 2026 | 1 | 201000020872 | Corrective |
| 10 Jun 2026 | 9 | 201000037853 | Corrective |
| 04 Jun 2026 | 9 | 203000002440 | Turnaround |
| 20 May 2026 | 2 | 201000006538 | Corrective |
| 13 May 2026 | 2 | 201000003548 | Corrective |
| 01 May 2026 | 3 | 201000030476 | Corrective |
| 22 Apr 2026 | 8 | 201000039223 | Corrective |