PIPE,6IN,SCH160,SS316,SMLS,6M LG
Material 4100027867 · PIPE · Plant 1000
AMonitorStockout
- Material
- 4100027867
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (8 of 15 FuncLocs A/B)
- Supplier
- RAJAWALI SARANA SENTOSA PT
- Lead time
- 41 d · P80 48 d
- Unit price
- Rp 319,015
Recommendation
- 1.Forecast 62 LG/year: 62 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~41 days; expected demand during lead time 7.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 82.
- 4.Installed on 15 FuncLoc(s), 8 of them criticality A/B.
- 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 18Single sourceAbnormal consumptionOpen PO
On hand / on order
0 / 35
next delivery 18 Oct 2026
Today Min / Max
13 / 31
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 20
Rec. Max
82
order qty 55
Service level
100.0%
stockout risk now 0%
Unit price
Rp 319,015
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 9 issue days in the last 180 days, last issue 26 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (18 units) excluded from the baseline.
Demand pattern Erratic · 29 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 15 functional locations
8 with criticality A/B · 89 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 12 | 38 | 14.58 |
| PX_HE-1074 C3 RECYCLE REBOILER | A | 12 | 3 | 1.08 |
| PX_HE-1913 DILUTION STEAM TLE | A | 6 | 1 | 0.22 |
| PX_HE-1026 METHANE TLE | A | 3 | 0 | 0.22 |
| PX_HE-1564C DILUTION STEAM TLE | A | 2 | 0 | 0.22 |
| PX_HE-439C LUBE OIL REBOILER | A | 3 | 0 | 0.22 |
| PX_4-HS-17957-A22A-T PIPE-4 FROM VD-687 TO PP-140C | B | 3 | 0 | 0.01 |
| PY_HE-1664 ETHYLENE COOLER | B | 12 | 0 | 0.22 |
| PX_2-HS-25182-A41A-T PIPE-2 FROM PP-120B TO HE-1256A | C | 1 | 1 | 0.44 |
| PX_1-BF-4138-C11A-H PIPE-1 FROM HE-600D TO HE-1624 | C | 2 | 0 | 0.01 |
| PX_1-QO-23198-A51A-C PIPE-1 FROM PP-1171 TO PP-1115 | C | 6 | 0 | 0.01 |
| PX_2-FG-15815-A22A-C PIPE-2 FROM PP-1178A TO HE-981 | C | 6 | 0 | 0.01 |
Lead time and procurement
Lead time 41 ± 31 days (PO history, 11 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 31 Aug 2026 | PR03 Regular replenishment | 44 | Rp 303,201 | 26 Sept 2026 | 26 d |
| 31 Aug 2026 | PR05 Project / turnaround | 35 | Rp 310,422 | 18 Oct 2026 open | 48 d |
| 07 Aug 2026 | PR03 Regular replenishment | 48 | Rp 328,140 | 05 Sept 2026 | 29 d |
| 28 Apr 2026 | PR03 Regular replenishment | 57 | Rp 326,921 | 31 May 2026 | 33 d |
| 10 Apr 2026 | PR03 Regular replenishment | 24 | Rp 307,670 | 06 May 2026 | 26 d |
| 28 Feb 2026 | PR06 Regular replenishment | 41 | Rp 322,881 | 17 Apr 2026 | 48 d |
| 26 Feb 2026 | PR06 Regular replenishment | 25 | Rp 302,792 | 29 Mar 2026 | 31 d |
| 10 Jan 2026 | PR01 Import / long-lead | 16 | Rp 319,015 | 04 Jun 2026 | 145 d |
| 01 Sept 2025 | PR03 Regular replenishment | 59 | Rp 325,553 | 18 Oct 2025 | 47 d |
| 27 Aug 2025 | PR03 Regular replenishment | 36 | Rp 302,820 | 27 Sept 2025 | 31 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 26 Aug 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 26 Aug 2026 | Medium | PX_BF-103 | Hot spot at convection BF-103 |
| 03 Aug 2026 | Medium | PX_BF-103 | Install scaffolding at BF-103 |
| 24 Jul 2026 | Medium | PX_BF-103 | Thermograph wall BF-103 |
| 23 Jul 2026 | Emergency | PX_BF-103 | Decoking follow up BF-103 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Sept 2026 | 2 | 201000005647 | Corrective |
| 15 Aug 2026 | 6 | 209000023087 | Other maintenance |
| 10 Aug 2026 | 2 | 201000006061 | Corrective |
| 20 Jul 2026 | 1 | 201000021863 | Corrective |
| 10 Jul 2026 | 1 | 201000013402 | Corrective |
| 18 May 2026 | 2 | 201000039669 | Corrective |
| 29 Apr 2026 | 1 | 201000018210 | Corrective |
| 26 Apr 2026 | 1 | 201000003940 | Corrective |
| 04 Apr 2026 | 4 | 205000036120 | Other maintenance |
| 24 Mar 2026 | 3 | 201000024042 | Corrective |
| 23 Feb 2026 | 1 | 201000000377 | Corrective |
| 13 Feb 2026 | 2 | 201000014966 | Corrective |
| 02 Feb 2026 | 9 | 201000009533 | Corrective |
| 02 Jan 2026 | 1 | 201000005842 | Corrective |
| 24 Dec 2025 | 2 | 201000029857 | Corrective |