Sparely
DU

PIPE,6IN,SCH160,SS316,SMLS,6M LG

Material 4100027867 · PIPE · Plant 1000

AMonitorStockout
Material
4100027867
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (8 of 15 FuncLocs A/B)
Supplier
RAJAWALI SARANA SENTOSA PT
Lead time
41 d · P80 48 d
Unit price
Rp 319,015

Recommendation

  • 1.Forecast 62 LG/year: 62 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~41 days; expected demand during lead time 7.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 27, order up to 82.
  • 4.Installed on 15 FuncLoc(s), 8 of them criticality A/B.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 18Single sourceAbnormal consumptionOpen PO
On hand / on order
0 / 35
next delivery 18 Oct 2026
Today Min / Max
13 / 31
static parameters in BoM
Rec. Min (reorder point)
27
safety stock 20
Rec. Max
82
order qty 55
Service level
100.0%
stockout risk now 0%
Unit price
Rp 319,015
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 9 issue days in the last 180 days, last issue 26 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 5 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (18 units) excluded from the baseline.

Demand pattern Erratic · 29 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 15 functional locations

8 with criticality A/B · 89 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A123814.58
PX_HE-1074
C3 RECYCLE REBOILER
A1231.08
PX_HE-1913
DILUTION STEAM TLE
A610.22
PX_HE-1026
METHANE TLE
A300.22
PX_HE-1564C
DILUTION STEAM TLE
A200.22
PX_HE-439C
LUBE OIL REBOILER
A300.22
PX_4-HS-17957-A22A-T
PIPE-4 FROM VD-687 TO PP-140C
B300.01
PY_HE-1664
ETHYLENE COOLER
B1200.22
PX_2-HS-25182-A41A-T
PIPE-2 FROM PP-120B TO HE-1256A
C110.44
PX_1-BF-4138-C11A-H
PIPE-1 FROM HE-600D TO HE-1624
C200.01
PX_1-QO-23198-A51A-C
PIPE-1 FROM PP-1171 TO PP-1115
C600.01
PX_2-FG-15815-A22A-C
PIPE-2 FROM PP-1178A TO HE-981
C600.01

Lead time and procurement

Lead time 41 ± 31 days (PO history, 11 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
31 Aug 2026PR03
Regular replenishment
44Rp 303,20126 Sept 202626 d
31 Aug 2026PR05
Project / turnaround
35Rp 310,42218 Oct 2026
open
48 d
07 Aug 2026PR03
Regular replenishment
48Rp 328,14005 Sept 202629 d
28 Apr 2026PR03
Regular replenishment
57Rp 326,92131 May 202633 d
10 Apr 2026PR03
Regular replenishment
24Rp 307,67006 May 202626 d
28 Feb 2026PR06
Regular replenishment
41Rp 322,88117 Apr 202648 d
26 Feb 2026PR06
Regular replenishment
25Rp 302,79229 Mar 202631 d
10 Jan 2026PR01
Import / long-lead
16Rp 319,01504 Jun 2026145 d
01 Sept 2025PR03
Regular replenishment
59Rp 325,55318 Oct 202547 d
27 Aug 2025PR03
Regular replenishment
36Rp 302,82027 Sept 202531 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
26 Aug 2026MediumPX_BF-103Replace lamp as per PM finding
26 Aug 2026MediumPX_BF-103Hot spot at convection BF-103
03 Aug 2026MediumPX_BF-103Install scaffolding at BF-103
24 Jul 2026MediumPX_BF-103Thermograph wall BF-103
23 Jul 2026EmergencyPX_BF-103Decoking follow up BF-103

Recent goods issues

Posting dateQtyOrderOrder type
05 Sept 20262201000005647Corrective
15 Aug 20266209000023087Other maintenance
10 Aug 20262201000006061Corrective
20 Jul 20261201000021863Corrective
10 Jul 20261201000013402Corrective
18 May 20262201000039669Corrective
29 Apr 20261201000018210Corrective
26 Apr 20261201000003940Corrective
04 Apr 20264205000036120Other maintenance
24 Mar 20263201000024042Corrective
23 Feb 20261201000000377Corrective
13 Feb 20262201000014966Corrective
02 Feb 20269201000009533Corrective
02 Jan 20261201000005842Corrective
24 Dec 20252201000029857Corrective