PIPE,8IN,SCH80,SS316,SMLS,6M LG

Material 4100027879 · PIPE · Plant 1000

AReorderNormalBelow reorder point
Material
4100027879
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
PERMATA SUPLINDO MAKMUR PT
Lead time
43 d · P80 70 d
Unit price
Rp 2.0M

Recommendation

  • 1.Forecast 36 LG/year: 36 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~43 days; expected demand during lead time 4.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 35.
  • 4.On hand 10 + on order 0 is at or below the reorder point: order 25 now.
  • 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
  • 6.ML early warning: 88% probability of demand in the next 90 days.
Proposed purchase requisition
25 LG
Rp 50.1M · order by 01 Oct 2026
Expected arrival ≈ 43 days
ML early warningLast turnaround used 3Single sourceAbnormal consumption
On hand / on order
10 / 0
no open PO
Today Min / Max
6 / 14
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 14
Rec. Max
35
order qty 17
Service level
99.9%
stockout risk now 5%
Unit price
Rp 2.0M
PO history
ML early warning: 88% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 78 days ago, 23 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (12 units) excluded from the baseline.

Demand pattern Lumpy · 21 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 5 functional locations

5 with criticality A/B · 34 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A211442.86
PX_HE-1500B
SEAL OIL CONDENSER
A673.22
PX_HE-520A
PROPYLENE PREHEATER
A1200.22
PX_HE-819
FUEL OIL CONDENSER
A200.22
PX_1-DS-10611-B22A-C
PIPE-1 FROM VD-255 TO HE-1913
B1200.01

Lead time and procurement

Lead time 43 ± 20 days (PO history, 6 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
26 Apr 2026PR03
Regular replenishment
16Rp 2.1M20 Jun 202655 d
28 Nov 2025PR03
Regular replenishment
23Rp 2.0M06 Feb 202670 d
02 Oct 2025PR03
Regular replenishment
36Rp 2.0M22 Nov 202551 d
30 Aug 2025PR06
Regular replenishment
18Rp 2.0M08 Nov 202570 d
12 Aug 2025PR03
Regular replenishment
29Rp 2.0M15 Sept 202534 d
08 Jun 2025PR06
Regular replenishment
23Rp 2.0M26 Jun 202518 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105
14 Sept 2026LowPX_BF-105Install cover plate BF-105
13 Sept 2026MediumPX_BF-105Thermograph wall BF-105
06 Sept 2026MediumPX_BF-105Repair insulation BF-105
01 Sept 2026LowPX_BF-105Peep door broken BF-105
30 Aug 2026MediumPX_BF-105Painting BF-105
29 Aug 2026MediumPX_BF-105Leak from packing
27 Aug 2026MediumPX_BF-105Thermograph wall BF-105

Recent goods issues

Posting dateQtyOrderOrder type
15 Jul 20266201000037405Corrective
28 Apr 20262201000020066Corrective
10 Mar 20261201000038284Corrective
28 Feb 20264201000035660Corrective
02 Feb 20263201000013025Corrective
29 Jan 20262201000006492Corrective
24 Jan 20261201000038629Corrective
20 Jan 20264201000039436Corrective
17 Jan 20264201000029530Corrective
26 Dec 20255201000005353Corrective
22 Dec 20253203000001878Turnaround
18 Dec 20252201000035232Corrective
11 Dec 20254201000034050Corrective
28 Nov 20251201000005829Corrective
02 Sept 20252201000010490Corrective