PIPE,1/4IN,STD,CS,SMLS,6M LG

Material 4100027966 · PIPE · Plant 1000

AMonitorHealthy
Material
4100027966
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
CAHAYA INDUSTRI SENTOSA PT
Lead time
30 d · P80 40 d
Unit price
Rp 3.2M

Recommendation

  • 1.Forecast 32 LG/year: 32 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~30 days; expected demand during lead time 2.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 13, order up to 26.
  • 4.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
  • 5.ML early warning: 91% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
9 / 7
next delivery 06 Oct 2026
Today Min / Max
5 / 13
static parameters in BoM
Rec. Min (reorder point)
13
safety stock 11
Rec. Max
26
order qty 13
Service level
99.9%
stockout risk now 0%
Unit price
Rp 3.2M
PO history
ML early warning: 91% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 7 issue days in the last 180 days, last issue 8 days ago, 12 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Smooth · 18 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 4 functional locations

2 with criticality A/B · 12 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_HE-1877D
SEAL OIL COOLER
B300.22
PX_HE-1061B
SPENT CAUSTIC TLE
C630.65
PX_1-CW-13155-B22A
PIPE-1 FROM PP-1890 TO PP-902B
C200.01

Lead time and procurement

Lead time 30 ± 20 days (PO history, 12 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
21 Jul 2026PR05
Project / turnaround
7Rp 3.2M06 Oct 2026
open
77 d
01 Jul 2026PR03
Regular replenishment
11Rp 3.2M25 Jul 202624 d
10 May 2026PR03
Regular replenishment
6Rp 3.2M02 Jun 202623 d
18 Apr 2026PR03
Regular replenishment
8Rp 3.4M12 May 202624 d
27 Feb 2026PR03
Regular replenishment
19Rp 3.3M11 Apr 202643 d
14 Dec 2025PR04
Regular (other)
16Rp 3.3M15 Feb 202663 d
20 Nov 2025PR03
Regular replenishment
12Rp 3.1M15 Dec 202525 d
11 Sept 2025PR03
Regular replenishment
11Rp 3.2M25 Sept 202514 d
24 Jul 2025PR03
Regular replenishment
15Rp 3.2M08 Aug 202515 d
05 Jul 2025PR03
Regular replenishment
7Rp 3.3M31 Jul 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
26 Aug 2026MediumPX_BF-103Replace lamp as per PM finding
26 Aug 2026MediumPX_BF-103Hot spot at convection BF-103
03 Aug 2026MediumPX_BF-103Install scaffolding at BF-103
24 Jul 2026MediumPX_BF-103Thermograph wall BF-103
23 Jul 2026EmergencyPX_BF-103Decoking follow up BF-103

Recent goods issues

Posting dateQtyOrderOrder type
23 Sept 20263209000029477Other maintenance
31 Aug 20262204000002151Preventive
11 Aug 20262201000019676Corrective
10 Jul 20266209000012005Other maintenance
07 Jul 20263204000027608Preventive
24 Jun 20262201000038584Corrective
19 May 20262201000037457Corrective
10 Feb 20262204000019376Preventive
22 Jan 20263201000027403Corrective
08 Jan 20261201000016973Corrective
15 Nov 20251201000030934Corrective
31 Oct 20251201000005094Corrective
20 Oct 20255201000034179Corrective
16 Sept 20254204000030900Preventive
19 Aug 20253201000029086Corrective