PIPE,6IN,SCH80,P11,SMLS,6M LG

Material 4100028020 · PIPE · Plant 1000

AMonitorExcess
Material
4100028020
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
SINAR TEKNIK INTERNASIONAL PT
Lead time
23 d · P80 25 d
Unit price
Rp 2.9M

Recommendation

  • 1.Forecast 33 LG/year: 33 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~23 days; expected demand during lead time 2.1.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 26.
  • 4.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
  • 5.ML early warning: 84% probability of demand in the next 90 days.
ML early warningLast turnaround used 39Single sourceAbnormal consumption
On hand / on order
35 / 0
no open PO
Today Min / Max
18 / 39
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 10
Rec. Max
26
order qty 14
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2.9M
PO history
ML early warning: 84% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 4 issue days in the last 180 days, last issue 18 days ago, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (39 units) excluded from the baseline.

Demand pattern Lumpy · 10 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 5 functional locations

5 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-112
CRACKING FURNACE BF-112
A27327.01
PX_HE-1913
DILUTION STEAM TLE
A210.22
PX_HE-949A
SEAL OIL PREHEATER
A210.65
PX_HE-1596B
HYDROGEN TLE
A1200.22
PX_HE-119A
ETHYLENE PREHEATER
B100.22

Lead time and procurement

Lead time 23 ± 12 days (PO history, 8 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
29 Jun 2026PR03
Regular replenishment
26Rp 2.9M17 Jul 202618 d
18 May 2026PR03
Regular replenishment
35Rp 2.9M01 Jun 202614 d
12 Apr 2026PR06
Regular replenishment
16Rp 2.9M23 Apr 202611 d
13 Feb 2026PR06
Regular replenishment
16Rp 2.9M08 Mar 202623 d
20 Nov 2025PR03
Regular replenishment
34Rp 3.0M17 Dec 202527 d
17 Nov 2025PR06
Regular replenishment
36Rp 2.9M08 Dec 202521 d
31 Oct 2025PR06
Regular replenishment
17Rp 2.8M14 Nov 202514 d
23 Jun 2025PR05
Project / turnaround
11Rp 3.0M02 Aug 202540 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
17 Sept 2026MediumPX_BF-112Cleaning burner BF-112
04 Sept 2026HighPX_BF-112Install scaffolding at BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
01 Sept 2026MediumPX_BF-112Replace burner tip BF-112
31 Aug 2026MediumPX_BF-112Install cover plate for MCP cracking
17 Aug 2026MediumPX_BF-112Painting BF-112
15 Aug 2026LowPX_BF-112Decoking follow up BF-112

Recent goods issues

Posting dateQtyOrderOrder type
13 Sept 20261201000035506Corrective
25 Jul 20266201000003691Corrective
13 Jul 20262201000029732Corrective
21 Apr 20261201000007143Corrective
15 Mar 20261201000001103Corrective
15 Mar 20262201000001103Corrective
21 Jan 20262201000009101Corrective
21 Jan 20261201000009101Corrective
22 Dec 202512203000001878Turnaround
11 Dec 20251201000020533Corrective
12 Nov 202527203000023445Turnaround
20 Aug 20254201000008115Corrective
10 Jul 202515209000024650Other maintenance
10 May 20255201000012393Corrective