PIPE,1-1/2IN,STD,CS,SMLS,6M LG
Material 4100028031 · PIPE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100028031
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 14 LG/year: 14 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~29 days; expected demand during lead time 1.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 19.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 17 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
17 LG
Rp 29.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Last turnaround used 15Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
19
order qty 12
Service level
99.9%
stockout risk now 16%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 8 days ago, 33 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (15 units) excluded from the baseline.
Demand pattern Lumpy · 11 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 2 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 2 | 82 | 30.86 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 3 | 38 | 14.58 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Sept 2026 | 1 | 201000037585 | Corrective |
| 31 Mar 2026 | 2 | 204000008605 | Preventive |
| 17 Feb 2026 | 1 | 201000005562 | Corrective |
| 18 Jan 2026 | 2 | 201000026755 | Corrective |
| 07 Jan 2026 | 1 | 201000020180 | Corrective |
| 14 Dec 2025 | 6 | 203000018502 | Turnaround |
| 08 Dec 2025 | 3 | 201000001903 | Corrective |
| 05 Dec 2025 | 3 | 201000026705 | Corrective |
| 29 Nov 2025 | 9 | 203000020446 | Turnaround |
| 13 Nov 2025 | 1 | 201000032012 | Corrective |
| 03 Nov 2025 | 2 | 201000005391 | Corrective |
| 04 Aug 2025 | 1 | 201000012606 | Corrective |
| 14 Jul 2025 | 1 | 201000006053 | Corrective |