PIPE,1-1/2IN,STD,CS,SMLS,6M LG

Material 4100028031 · PIPE · Plant 1000

AReorderNormalBelow reorder point
Material
4100028031
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 14 LG/year: 14 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~29 days; expected demand during lead time 1.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 19.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 17 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
17 LG
Rp 29.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Last turnaround used 15Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
19
order qty 12
Service level
99.9%
stockout risk now 16%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 8 days ago, 33 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (15 units) excluded from the baseline.

Demand pattern Lumpy · 11 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A28230.86
PX_BF-103
CRACKING FURNACE BF-103
A33814.58

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106

Recent goods issues

Posting dateQtyOrderOrder type
23 Sept 20261201000037585Corrective
31 Mar 20262204000008605Preventive
17 Feb 20261201000005562Corrective
18 Jan 20262201000026755Corrective
07 Jan 20261201000020180Corrective
14 Dec 20256203000018502Turnaround
08 Dec 20253201000001903Corrective
05 Dec 20253201000026705Corrective
29 Nov 20259203000020446Turnaround
13 Nov 20251201000032012Corrective
03 Nov 20252201000005391Corrective
04 Aug 20251201000012606Corrective
14 Jul 20251201000006053Corrective