PIPE,1/2IN,SCH80,P11,SMLS,6M LG
Material 4100028077 · PIPE · Plant 1000
BMonitorHealthy
- Material
- 4100028077
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- SURYA INSTRUMEN MAKMUR PT
- Lead time
- 26 d · P80 28 d
- Unit price
- Rp 660,118
Recommendation
- 1.Forecast 14 LG/year: 14 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~26 days; expected demand during lead time 1.0.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 22.
- 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
- 5.ML early warning: 64% probability of demand in the next 90 days.
ML early warningSingle source
On hand / on order
13 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
22
order qty 15
Service level
99.6%
stockout risk now 0%
Unit price
Rp 660,118
PO history
ML early warning: 64% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 93 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 298.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.
Installed on 1 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-397A GASOLINE REBOILER | B | 3 | 2 | 0.65 |
Lead time and procurement
Lead time 26 ± 13 days (PO history, 3 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 May 2026 | PR06 Regular replenishment | 12 | Rp 649,118 | 03 Jun 2026 | 19 d |
| 09 Feb 2026 | PR06 Regular replenishment | 7 | Rp 660,118 | 27 Feb 2026 | 18 d |
| 20 Dec 2025 | PR06 Regular replenishment | 10 | Rp 663,720 | 23 Jan 2026 | 34 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Oct 2025 | Low | PX_HE-397A | Leak from packing |
| 07 May 2025 | Medium | PX_HE-397A | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Jun 2026 | 6 | 209000022177 | Other maintenance |
| 12 Apr 2026 | 2 | 201000013543 | Corrective |
| 22 Jan 2026 | 3 | 206000038371 | Other maintenance |
| 22 Jan 2026 | 1 | 206000038371 | Other maintenance |
| 16 Jan 2026 | 1 | 201000029144 | Corrective |
| 12 Dec 2025 | 4 | 201000029528 | Corrective |
| 07 Oct 2025 | 2 | 201000034670 | Corrective |
| 17 Sept 2025 | 1 | 201000032231 | Corrective |
| 24 Aug 2025 | 3 | 201000033690 | Corrective |
| 13 May 2025 | 7 | 201000026786 | Corrective |