Sparely
DU

PIPE,1/2IN,SCH80,P11,SMLS,6M LG

Material 4100028077 · PIPE · Plant 1000

BMonitorHealthy
Material
4100028077
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
26 d · P80 28 d
Unit price
Rp 660,118

Recommendation

  • 1.Forecast 14 LG/year: 14 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~26 days; expected demand during lead time 1.0.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 22.
  • 4.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
  • 5.ML early warning: 64% probability of demand in the next 90 days.
ML early warningSingle source
On hand / on order
13 / 0
no open PO
Today Min / Max
3 / 6
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
22
order qty 15
Service level
99.6%
stockout risk now 0%
Unit price
Rp 660,118
PO history
ML early warning: 64% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 93 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 298.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-397A
GASOLINE REBOILER
B320.65

Lead time and procurement

Lead time 26 ± 13 days (PO history, 3 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
15 May 2026PR06
Regular replenishment
12Rp 649,11803 Jun 202619 d
09 Feb 2026PR06
Regular replenishment
7Rp 660,11827 Feb 202618 d
20 Dec 2025PR06
Regular replenishment
10Rp 663,72023 Jan 202634 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Oct 2025LowPX_HE-397ALeak from packing
07 May 2025MediumPX_HE-397ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
30 Jun 20266209000022177Other maintenance
12 Apr 20262201000013543Corrective
22 Jan 20263206000038371Other maintenance
22 Jan 20261206000038371Other maintenance
16 Jan 20261201000029144Corrective
12 Dec 20254201000029528Corrective
07 Oct 20252201000034670Corrective
17 Sept 20251201000032231Corrective
24 Aug 20253201000033690Corrective
13 May 20257201000026786Corrective