PIPE,1/2IN,SCH40,CS,SMLS,6M LG

Material 4100028090 · PIPE · Plant 1000

ALong-leadMonitorCritical insurance spare
Material
4100028090
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA PERSADA PT
Lead time
56 d · P80 93 d
Unit price
Rp 726,539

Recommendation

  • 1.Forecast 1.4 LG/year: 1.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~56 days; expected demand during lead time 0.2.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Long lead time: 80% of deliveries took up to 93 days and the fastest seen in its category 13 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 7.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidateLong-leadSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.8%
stockout risk now 7%
Unit price
Rp 726,539
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 127.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 5 functional locations

3 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_HE-388A
CHARGE GAS EXCHANGER
A351.93
PX_HE-372C
HYDROGEN REBOILER
B600.22
PX_3/4-QO-14676-B23A-T
PIPE-3/4 FROM PP-785A TO PP-681B
C600.01
PX_6-BF-27301-A41A-T
PIPE-6 FROM VD-1133 TO KC-930C
C100.01

Lead time and procurement

Lead time 56 ± 19 days (PO history, 3 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
02 Sept 2025PR03
Regular replenishment
1Rp 722,77315 Dec 2025104 d
09 Aug 2025PR06
Regular replenishment
2Rp 730,55013 Oct 202565 d
10 Jun 2025PR04
Regular (other)
2Rp 726,53926 Aug 202577 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026MediumPX_HE-388AReplace lamp as per PM finding
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
10 Sept 2026MediumPX_BF-111Peep door broken BF-111
05 Aug 2026MediumPX_HE-388AHE-388A fouling
03 Aug 2026MediumPX_BF-111Thermograph wall BF-111
11 Jul 2026MediumPX_BF-111Thermograph wall BF-111
27 Jun 2026MediumPX_BF-111Leak from packing
23 Jun 2026LowPX_HE-388AInstall scaffolding at HE-388A
08 May 2026MediumPX_BF-111Repair refractory crack BF-111
20 Apr 2026EmergencyPX_BF-111Cleaning burner BF-111

Recent goods issues

Never issued in the 17-month history.