PIPE,6IN,SCH160,P11,SMLS,6M LG

Material 4100028115 · PIPE · Plant 1000

AReorderNormalBelow reorder point
Material
4100028115
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 1.2 LG/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 LG
Rp 5.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 35 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 322.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 3 functional locations

2 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_1-1/2-QO-11825-B21A-HS
PIPE-1-1/2 FROM PP-1583A TO VD-1815A
A630.87
PX_HE-1393C
QUENCH WATER PREHEATER
A1231.08
PX_3/4-LS-18620-A41A-C
PIPE-3/4 FROM KC-891A TO PP-1630A
C320.44

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026MediumPX_1-1/2-QO-11825-B21A-HSReinject compound online clamp sealing
26 Aug 2026MediumPX_HE-1393CHE-1393C tube leak
23 Aug 2026HighPX_HE-1393CReplace lamp as per PM finding
14 Jan 2026MediumPX_3/4-LS-18620-A41A-CReplace pipe 3/4-LS-18620-A41A-C
24 Aug 2025LowPX_1-1/2-QO-11825-B21A-HSLeak at 1-1/2-QO-11825-B21A-HS
24 May 2025MediumPX_1-1/2-QO-11825-B21A-HSClean dummy leg 1-1/2-QO-11825-B21A-HS
13 May 2025MediumPX_HE-1393CPSM25/Replace lamp as per PM finding
02 May 2025LowPX_3/4-LS-18620-A41A-CPainting 3/4-LS-18620-A41A-C

Recent goods issues

Posting dateQtyOrderOrder type
27 Aug 20261201000015396Corrective