PIPE,6IN,SCH160,P11,SMLS,6M LG
Material 4100028115 · PIPE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100028115
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 1.2 LG/year: 1.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 3 now.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
3 LG
Rp 5.1M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 35 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 322.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 3 functional locations
2 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-1/2-QO-11825-B21A-HS PIPE-1-1/2 FROM PP-1583A TO VD-1815A | A | 6 | 3 | 0.87 |
| PX_HE-1393C QUENCH WATER PREHEATER | A | 12 | 3 | 1.08 |
| PX_3/4-LS-18620-A41A-C PIPE-3/4 FROM KC-891A TO PP-1630A | C | 3 | 2 | 0.44 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_1-1/2-QO-11825-B21A-HS | Reinject compound online clamp sealing |
| 26 Aug 2026 | Medium | PX_HE-1393C | HE-1393C tube leak |
| 23 Aug 2026 | High | PX_HE-1393C | Replace lamp as per PM finding |
| 14 Jan 2026 | Medium | PX_3/4-LS-18620-A41A-C | Replace pipe 3/4-LS-18620-A41A-C |
| 24 Aug 2025 | Low | PX_1-1/2-QO-11825-B21A-HS | Leak at 1-1/2-QO-11825-B21A-HS |
| 24 May 2025 | Medium | PX_1-1/2-QO-11825-B21A-HS | Clean dummy leg 1-1/2-QO-11825-B21A-HS |
| 13 May 2025 | Medium | PX_HE-1393C | PSM25/Replace lamp as per PM finding |
| 02 May 2025 | Low | PX_3/4-LS-18620-A41A-C | Painting 3/4-LS-18620-A41A-C |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Aug 2026 | 1 | 201000015396 | Corrective |