PIPE,3/4IN,SCH40,CS,SMLS,6M LG

Material 4100028191 · PIPE · Plant 1000

AReduceSlow-moving
Material
4100028191
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (4 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 56 LG/year: 56 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 4.5.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 24, order up to 47.
  • 4.Stock 107 exceeds the level to keep (47) by 60.
  • 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
Last turnaround used 15Price estimatedLead time estimated
On hand / on order
107 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
24
safety stock 20
Rec. Max
47
order qty 23
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 356 days ago, 22 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (15 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 5 functional locations

4 with criticality A/B · 18 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A128230.86
PX_HE-693B
ETHYLENE EXCHANGER
A131.08
PX_HE-721D
LUBE OIL PREHEATER
A100.22
PX_2-P-2392-A22A
PIPE-2 FROM PP-752B TO PP-497A
B200.01
PX_3/4-QO-1020-A21A
PIPE-3/4 FROM HE-706A TO KC-226
C200.01

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
21 Sept 2026MediumPX_HE-693BRetubing HE-693B
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106
15 Sept 2026MediumPX_BF-106Install cover plate BF-106
14 Sept 2026LowPX_BF-106Peep door broken BF-106
10 Sept 2026MediumPX_BF-106Replace burner tip BF-106
08 Sept 2026LowPX_BF-106Leak from packing
08 Sept 2026MediumPX_BF-106Painting BF-106

Recent goods issues

Posting dateQtyOrderOrder type
21 Dec 202515203000033370Turnaround
10 Oct 20256201000027944Corrective