PIPE,3IN,SCH40,SS316,SMLS,6M LG
Material 4100028227 · PIPE · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100028227
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 37 LG/year: 37 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 2.9.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 20, order up to 38.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 36 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
36 LG
Rp 61.6M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
20
safety stock 18
Rec. Max
38
order qty 18
Service level
99.9%
stockout risk now 36%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 328 days ago, 19 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 3 functional locations
1 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-103 CRACKING FURNACE BF-103 | A | 3 | 38 | 14.58 |
| PX_3-P-29227-A22A-HS PIPE-3 FROM VD-826 TO VD-1706 | C | 6 | 0 | 0.01 |
| PX_BF-108 CRACKING FURNACE BF-108 | S | 2 | 23 | 9.44 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 25 Sept 2026 | Medium | PX_BF-108 | Repair refractory crack BF-108 |
| 24 Sept 2026 | High | PX_BF-108 | Leak from packing |
| 20 Sept 2026 | Medium | PX_BF-103 | Leak from packing |
| 19 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 15 Sept 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
| 11 Sept 2026 | Medium | PX_BF-103 | Decoking follow up BF-103 |
| 10 Sept 2026 | Medium | PX_BF-108 | [MSI-B-26-JJB-193] Permanent repair |
| 07 Sept 2026 | Medium | PX_BF-108 | Leak from packing |
| 26 Aug 2026 | Medium | PX_BF-103 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 07 Nov 2025 | 1 | 201000010135 | Corrective |
| 07 Nov 2025 | 2 | 201000010135 | Corrective |
| 06 Nov 2025 | 8 | 201000010135 | Corrective |
| 06 Nov 2025 | 2 | 201000010135 | Corrective |