PIPE,8IN,SCH160,CS,SMLS,6M LG
Material 4100028240 · PIPE · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100028240
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 0.7 LG/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 1 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
1 LG
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 251 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 199.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 3 functional locations
1 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-896C GASOLINE COOLER | A | 12 | 0 | 0.22 |
| PX_1-HS-18000-D12A-HS PIPE-1 FROM PP-1107B TO HE-1003D | C | 3 | 0 | 0.01 |
| PX_HE-1767 SLOP OIL TLE | C | 6 | 0 | 0.22 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 23 Jan 2026 | 1 | 201000008172 | Corrective |
| 22 Jan 2026 | 1 | 201000008172 | Corrective |