PIPE,2IN,SCH160,P11,SMLS,6M LG

Material 4100028241 · PIPE · Plant 1000

AReduceNon-moving
Material
4100028241
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 0.5 LG/year: 0.5 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
  • 4.Stock 14 exceeds the level to keep (3) by 11.
  • 5.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
14 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
98.8%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 42.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 7 functional locations

4 with criticality A/B · 40 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-234C
REFLUX EXCHANGER
A310.22
PX_HE-118B
C4 PRODUCT CONDENSER
A300.22
PX_2-DS-23750-A41A-T
PIPE-2 FROM PP-1384B TO HE-1975
B1200.01
PX_HE-1562B
SEAL OIL REBOILER
B1200.22
PX_16-FG-21944-B23A-T
PIPE->16 FROM PP-280A TO PP-448
C100.01
PX_3-FG-15752-A21A-T
PIPE-3 FROM KC-511C TO VD-422
C300.01
PX_BF-101
CRACKING FURNACE BF-101
S683.02

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
22 Jun 2026LowPX_BF-101Thermograph wall BF-101
06 Jun 2026EmergencyPX_BF-101Decoking follow up BF-101
27 Nov 2025MediumPX_BF-101Peep door broken BF-101
15 Oct 2025MediumPX_BF-101Install scaffolding at BF-101
13 Aug 2025EmergencyPX_BF-101Leak from packing
02 Jun 2025LowPX_BF-101Install cover plate BF-101
14 May 2025MediumPX_HE-234CPSM25/Leak from packing

Recent goods issues

Never issued in the 17-month history.