PIPE,10IN,SCH40,CS,SMLS,6M LG
Material 4100028260 · PIPE · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100028260
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 1.5 LG/year: 1.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 4%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 10 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 139.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 5 functional locations
2 with criticality A/B · 25 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-104 CRACKING FURNACE BF-104 | A | 2 | 28 | 11.58 |
| PY_HE-1243B BFW TLE | B | 6 | 1 | 0.65 |
| PX_12-BF-11215-D12A-T PIPE-12 FROM VD-488B TO KC-396 | C | 3 | 0 | 0.01 |
| PX_2-P-1882-B21A PIPE-2 FROM HE-605 TO HE-1473C | C | 12 | 0 | 0.01 |
| PX_4-DS-17552-B23A-T PIPE-4 FROM PP-1721A TO PP-1694A | C | 2 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
| 16 Sept 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
| 13 Sept 2026 | Low | PX_BF-104 | Install cover plate for MCP cracking |
| 04 Sept 2026 | Medium | PX_BF-104 | Replace burner tip BF-104 |
| 01 Sept 2026 | Medium | PX_BF-104 | Install scaffolding at BF-104 |
| 29 Aug 2026 | High | PX_BF-104 | Leak from packing |
| 08 Aug 2026 | Low | PX_BF-104 | [MSI-B-26-MZB-191] Permanent repair |
| 04 Aug 2026 | Medium | PX_BF-104 | Thermograph wall BF-104 |
| 04 Aug 2026 | Medium | PX_BF-104 | Peep door broken BF-104 |
| 21 Jul 2026 | Medium | PX_BF-104 | Hot spot at convection BF-104 |
Recent goods issues
Never issued in the 17-month history.