PIPE,10IN,STD,P11,SMLS,6M LG

Material 4100028271 · PIPE · Plant 1000

AMonitorCritical insurance spare
Material
4100028271
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 5.3 LG/year: 5.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
12
order qty 6
Service level
100.0%
stockout risk now 13%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 27 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 493.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 4 functional locations

2 with criticality A/B · 23 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-102
CRACKING FURNACE BF-102
A127128.72
PX_BF-103
CRACKING FURNACE BF-103
A23814.58
PX_3/4-LS-10065-A22A-H
PIPE-3/4 FROM HE-1547 TO VD-999
C600.01
PX_3/4-MS-5758-C11A-T
PIPE-3/4 FROM CL-933 TO HE-532D
C300.01

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
20 Sept 2026MediumPX_BF-103Leak from packing
19 Sept 2026LowPX_BF-103Leak from packing
15 Sept 2026MediumPX_BF-103Replace lamp as per PM finding
11 Sept 2026MediumPX_BF-103Decoking follow up BF-103
07 Sept 2026LowPX_BF-102Thermograph wall BF-102
06 Sept 2026MediumPX_BF-102Decoking follow up BF-102
03 Sept 2026MediumPX_BF-102Replace lamp as per PM finding
30 Aug 2026HighPX_BF-102Painting BF-102

Recent goods issues

Never issued in the 17-month history.