PIPE,1IN,SCH40,P11,SMLS,6M LG
Material 4100028329 · PIPE · Plant 1000
AReorderCriticalSlow-moving
- Material
- 4100028329
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 22 LG/year: 22 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 1.8.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 26.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 25 now.
- 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
25 LG
Rp 42.8M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 11
Rec. Max
26
order qty 14
Service level
100.0%
stockout risk now 44%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 292 days ago, 21 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 4 functional locations
2 with criticality A/B · 10 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_HE-1975 HYDROGEN COOLER | A | 2 | 3 | 1.50 |
| PX_1-1/2-CW-16705-A51A-C PIPE-1-1/2 FROM PP-200A TO PP-940C | C | 6 | 1 | 0.01 |
| PX_6-P-9444-A51A-H PIPE-6 FROM HE-536 TO HE-538B | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
| 08 Sept 2026 | Medium | PX_BF-106 | Painting BF-106 |
| 03 Sept 2026 | Medium | PX_BF-106 | Install cover plate for MCP cracking |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 13 Dec 2025 | 1 | 201000017128 | Corrective |
| 29 Aug 2025 | 5 | 204000013913 | Preventive |