Sparely
DU

PIPE,12IN,SCH80,SS316,SMLS,6M LG

Material 4100028399 · PIPE · Plant 1000

BMaintainCritical insurance spare
Material
4100028399
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 0.0 LG/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 670,424/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 2 functional locations

1 with criticality A/B · 18 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1967C
DEMIN WATER PREHEATER
B610.22
PX_20-P-5218-B23A-T
PIPE->16 FROM PP-1906B TO PP-912
C1200.01

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 May 2025MediumPX_HE-1967CLeak from packing

Recent goods issues

Never issued in the 17-month history.