PIPE,10IN,SCH80,SS316,SMLS,6M LG

Material 4100028481 · PIPE · Plant 1000

AReorderNormalSlow-moving
Material
4100028481
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (5 of 5 FuncLocs A/B)
Supplier
BINTANG MESINDO PRATAMA PT
Lead time
26 d · P80 51 d
Unit price
Rp 2.2M

Recommendation

  • 1.Forecast 7.7 LG/year: 7.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~26 days; expected demand during lead time 0.5.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 12.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 10 now.
  • 5.Installed on 5 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
10 LG
Rp 21.7M · order by 01 Oct 2026
Expected arrival ≈ 26 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
12
order qty 8
Service level
99.7%
stockout risk now 3%
Unit price
Rp 2.2M
PO history
ML early warning: 21% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 495 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 5 functional locations

5 with criticality A/B · 38 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A22911.58
PX_HE-149A
HYDROGEN COOLER
A620.65
PX_HE-1817C
WASH WATER TLE
A600.22
PX_20-HS-1722-B21A-T
PIPE->16 FROM VD-749A TO HE-236B
B1210.44
PY_HE-965B
RECYCLE ETHANE TLE
B1200.22

Lead time and procurement

Lead time 26 ± 18 days (PO history + category, 1 PO lines) · on-time 49%

PR dateTypeQtyUnit priceDeliveryLead time
30 Apr 2026PR03
Regular replenishment
2Rp 2.2M15 May 202615 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109
09 Jul 2026LowPX_BF-109Leak from packing
01 Jul 2026EmergencyPX_BF-109[MSI-B-26-YDN-280/M] Replace line
23 Jun 2026HighPX_BF-109Cleaning burner BF-109

Recent goods issues

Posting dateQtyOrderOrder type
24 May 20252201000007863Corrective