PIPE,12IN,STD,P11,SMLS,6M LG
Material 4100028563 · PIPE · Plant 1000
CReducePotentially obsolete
- Material
- 4100028563
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 0.1 LG/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 2 exceeds the level to keep (0) by 2.
Convert to Non StockPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 127,698/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~13 days.
Installed on 3 functional locations
0 with criticality A/B · 21 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_1-IA-7369-B23A PIPE-1 FROM PP-315A TO HE-1647D | C | 3 | 1 | 0.44 |
| PX_10-MS-16802-C11A-HS PIPE-10 FROM PP-1865A TO HE-1603 | C | 12 | 0 | 0.01 |
| PX_2-LS-20945-A21A-C PIPE-2 FROM HE-565B TO VD-1523 | C | 6 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Jul 2025 | Medium | PX_1-IA-7369-B23A | Replace lamp as per PM finding |
Recent goods issues
Never issued in the 17-month history.