Sparely
DU

PIPE,8IN,SCH80,P11,SMLS,6M LG

Material 4100028636 · PIPE · Plant 1000

AReorderNormalSlow-moving
Material
4100028636
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (3 of 3 FuncLocs A/B)
Supplier
SAMUDRA SEJAHTERA PERSADA PT
Lead time
29 d · P80 51 d
Unit price
Rp 344,855

Recommendation

  • 1.Forecast 1.9 LG/year: 1.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 3 now.
  • 5.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
3 LG
Rp 1.0M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
100.0%
stockout risk now 0%
Unit price
Rp 344,855
PO history
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 229 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 352.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 3 functional locations

3 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-606D
DEMIN WATER COOLER
A1200.22
PX_HE-1890C
REFLUX CONDENSER
B141.93
PX_HE-1375C
FEED COOLER
B620.65

Lead time and procurement

Lead time 29 ± 18 days (PO history + category, 1 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
08 Jun 2026PR03
Regular replenishment
2Rp 344,85505 Jul 202627 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Sept 2026MediumPX_HE-1890CRetubing HE-1890C
25 May 2026MediumPX_HE-1890CHE-1890C tube leak
23 Feb 2026MediumPX_HE-1890CHE-1890C fouling
06 Oct 2025LowPX_HE-1375CHE-1375C tube leak
28 Jun 2025MediumPX_HE-1890CHE-1890C tube leak
22 May 2025LowPX_HE-1375CReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
14 Feb 20262201000039569Corrective
06 Feb 20261201000033513Corrective