PIPE,3/4IN,SCH80,CS,SMLS,6M LG

Material 4100028820 · PIPE · Plant 1000

AReduceSlow-moving
Material
4100028820
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
28 d · P80 51 d
Unit price
Rp 1.3M

Recommendation

  • 1.Forecast 7.5 LG/year: 7.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~28 days; expected demand during lead time 0.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 14.
  • 4.Stock 128 exceeds the level to keep (14) by 114.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Single source
On hand / on order
128 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
14
order qty 8
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1.3M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 271 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 4 functional locations

3 with criticality A/B · 13 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_HE-708A
SLOP OIL COOLER
A310.22
PX_HE-694C
LEAN AMINE CONDENSER
B620.65
PX_2-MS-13283-A51A-T
PIPE-2 FROM PP-1574B TO VD-843C
C310.01

Lead time and procurement

Lead time 28 ± 18 days (PO history + category, 1 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
20 Mar 2026PR03
Regular replenishment
2Rp 1.3M15 Apr 202626 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
13 Sept 2026MediumPX_BF-109Install scaffolding at BF-109
03 Sept 2026LowPX_BF-109Install scaffolding at BF-109
02 Sept 2026LowPX_BF-109Install cover plate for MCP cracking
16 Aug 2026MediumPX_BF-109Install cover plate BF-109
13 Jul 2026MediumPX_BF-109Cleaning burner BF-109
09 Jul 2026MediumPX_BF-109Thermograph wall BF-109
09 Jul 2026LowPX_BF-109Leak from packing
01 Jul 2026EmergencyPX_BF-109[MSI-B-26-YDN-280/M] Replace line
23 Jun 2026HighPX_BF-109Cleaning burner BF-109

Recent goods issues

Posting dateQtyOrderOrder type
03 Jan 20262201000019978Corrective