PIPE,12IN,SCH160,P11,SMLS,6M LG
Material 4100028938 · PIPE · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100028938
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 0.1 LG/year: 0.1 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
99.6%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 12.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 3 functional locations
2 with criticality A/B · 17 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_3/4-MS-11706-A51A-H PIPE-3/4 FROM PP-1348 TO HE-1982 | A | 12 | 0 | 0.01 |
| PX_HE-1003D C4 PRODUCT COOLER | B | 2 | 1 | 0.22 |
| PX_8-LS-5321-A21A-H PIPE-8 FROM HE-1510A TO HE-593C | C | 3 | 3 | 0.87 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Apr 2026 | Low | PX_8-LS-5321-A21A-H | Clean dummy leg 8-LS-5321-A21A-H |
| 25 Sept 2025 | Medium | PX_8-LS-5321-A21A-H | Replace lamp as per PM finding |
| 15 May 2025 | Medium | PX_HE-1003D | PSM25/Install scaffolding at HE-1003D |
| 07 May 2025 | Medium | PX_8-LS-5321-A21A-H | Clean dummy leg 8-LS-5321-A21A-H |
Recent goods issues
Never issued in the 17-month history.