PIPE,1/4IN,SCH80,SS316,SMLS,6M LG

Material 4100028974 · PIPE · Plant 1000

AReduceNon-moving
Material
4100028974
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 1.5 LG/year: 1.5 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Stock 25 exceeds the level to keep (6) by 19.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
25 / 0
no open PO
Today Min / Max
10 / 25
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 137.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

1 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_BF-101
CRACKING FURNACE BF-101
S683.02

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
14 Sept 2026MediumPX_BF-101Replace lamp as per PM finding
08 Sept 2026MediumPX_BF-107Replace lamp as per PM finding
16 Aug 2026MediumPX_BF-101Install scaffolding at BF-101
15 Aug 2026MediumPX_BF-107Hot spot at convection BF-107
08 Aug 2026LowPX_BF-107Cleaning burner BF-107
21 Jul 2026MediumPX_BF-107Replace lamp as per PM finding
21 Jul 2026MediumPX_BF-107Thermograph wall BF-107
18 Jul 2026EmergencyPX_BF-107Hot spot at convection BF-107
10 Jul 2026MediumPX_BF-107Hot spot at convection BF-107

Recent goods issues

Never issued in the 17-month history.