PIPE,3/4IN,SCH40,SS316,SMLS,6M LG

Material 4100029100 · PIPE · Plant 1000

AReorderNormalBelow reorder point
Material
4100029100
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (4 of 4 FuncLocs A/B)
Supplier
SURYA INSTRUMEN MAKMUR PT
Lead time
34 d · P80 41 d
Unit price
Rp 3.0M

Recommendation

  • 1.Forecast 6.6 LG/year: 6.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~34 days; expected demand during lead time 0.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 7 now.
  • 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
7 LG
Rp 21.0M · order by 01 Oct 2026
Expected arrival ≈ 34 days
ML early warningSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
12
order qty 6
Service level
99.9%
stockout risk now 2%
Unit price
Rp 3.0M
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 19 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 611.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 4 functional locations

4 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-949A
SEAL OIL PREHEATER
A610.65
PX_HE-611D
REFLUX PREHEATER
A100.22
PX_HE-457D
METHANOL PREHEATER
B641.50
PX_HE-1874C
METHANOL COOLER
B131.08

Lead time and procurement

Lead time 34 ± 11 days (PO history, 3 PO lines) · on-time 34%

PR dateTypeQtyUnit priceDeliveryLead time
03 Jul 2026PR03
Regular replenishment
2Rp 3.0M14 Aug 202642 d
03 Mar 2026PR03
Regular replenishment
2Rp 3.1M11 Apr 202639 d
27 Sept 2025PR03
Regular replenishment
4Rp 3.0M31 Oct 202534 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
03 Sept 2026MediumPX_HE-457DCleaning HE-457D
08 Jul 2026MediumPX_HE-1874CReplace lamp as per PM finding
03 Mar 2026MediumPX_HE-1874CLeak from packing
23 Feb 2026MediumPX_HE-457DHE-457D fouling
25 Dec 2025HighPX_HE-457DRetubing HE-457D
23 Jul 2025LowPX_HE-949ALeak from packing
03 May 2025MediumPX_HE-1874CHE-1874C fouling
03 May 2025MediumPX_HE-457DPSM25/Painting HE-457D

Recent goods issues

Posting dateQtyOrderOrder type
12 Sept 20261201000010974Corrective
17 Jan 20261201000023201Corrective
17 Jan 20265201000023201Corrective
23 Dec 20252201000006328Corrective