PIPE,3/4IN,SCH40,SS316,SMLS,6M LG
Material 4100029100 · PIPE · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100029100
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (4 of 4 FuncLocs A/B)
- Supplier
- SURYA INSTRUMEN MAKMUR PT
- Lead time
- 34 d · P80 41 d
- Unit price
- Rp 3.0M
Recommendation
- 1.Forecast 6.6 LG/year: 6.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~34 days; expected demand during lead time 0.6.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 12.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 7 now.
- 5.Installed on 4 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 33% probability of demand in the next 90 days.
Proposed purchase requisition
7 LG
Rp 21.0M · order by 01 Oct 2026
Expected arrival ≈ 34 days
ML early warningSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
12
order qty 6
Service level
99.9%
stockout risk now 2%
Unit price
Rp 3.0M
PO history
ML early warning: 33% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 19 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 611.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 4 functional locations
4 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-949A SEAL OIL PREHEATER | A | 6 | 1 | 0.65 |
| PX_HE-611D REFLUX PREHEATER | A | 1 | 0 | 0.22 |
| PX_HE-457D METHANOL PREHEATER | B | 6 | 4 | 1.50 |
| PX_HE-1874C METHANOL COOLER | B | 1 | 3 | 1.08 |
Lead time and procurement
Lead time 34 ± 11 days (PO history, 3 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 Jul 2026 | PR03 Regular replenishment | 2 | Rp 3.0M | 14 Aug 2026 | 42 d |
| 03 Mar 2026 | PR03 Regular replenishment | 2 | Rp 3.1M | 11 Apr 2026 | 39 d |
| 27 Sept 2025 | PR03 Regular replenishment | 4 | Rp 3.0M | 31 Oct 2025 | 34 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 03 Sept 2026 | Medium | PX_HE-457D | Cleaning HE-457D |
| 08 Jul 2026 | Medium | PX_HE-1874C | Replace lamp as per PM finding |
| 03 Mar 2026 | Medium | PX_HE-1874C | Leak from packing |
| 23 Feb 2026 | Medium | PX_HE-457D | HE-457D fouling |
| 25 Dec 2025 | High | PX_HE-457D | Retubing HE-457D |
| 23 Jul 2025 | Low | PX_HE-949A | Leak from packing |
| 03 May 2025 | Medium | PX_HE-1874C | HE-1874C fouling |
| 03 May 2025 | Medium | PX_HE-457D | PSM25/Painting HE-457D |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Sept 2026 | 1 | 201000010974 | Corrective |
| 17 Jan 2026 | 1 | 201000023201 | Corrective |
| 17 Jan 2026 | 5 | 201000023201 | Corrective |
| 23 Dec 2025 | 2 | 201000006328 | Corrective |