PIPE,1/2IN,SCH160,SS316,SMLS,6M LG

Material 4100029434 · PIPE · Plant 1000

AReduceNon-moving
Material
4100029434
Category
PIPE
Base unit
LG
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 51 d
Unit price
Rp 1.7M (est.)

Recommendation

  • 1.Forecast 0.4 LG/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
  • 4.Stock 9 exceeds the level to keep (3) by 6.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
9 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
99.0%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 36.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_HE-1483A
C4 PRODUCT COOLER
A2113.22

Lead time and procurement

Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Sept 2026MediumPX_HE-1483AHE-1483A fouling
21 Aug 2026LowPX_HE-1483AReplace lamp as per PM finding
15 Jul 2026LowPX_HE-1483APainting HE-1483A
28 Jun 2026HighPX_HE-1483ALeak from packing
08 Apr 2026MediumPX_HE-1483AHE-1483A tube leak
04 Apr 2026MediumPX_HE-1483ARetubing HE-1483A
31 Jan 2026LowPX_HE-1483AReplace lamp as per PM finding
01 Jan 2026MediumPX_HE-1483AReplace lamp as per PM finding
04 Dec 2025MediumPX_HE-1483AInstall scaffolding at HE-1483A
23 Oct 2025MediumPX_HE-1483AInstall scaffolding at HE-1483A

Recent goods issues

Never issued in the 17-month history.