PIPE,1/2IN,SCH160,SS316,SMLS,6M LG
Material 4100029434 · PIPE · Plant 1000
AReduceNon-moving
- Material
- 4100029434
- Category
- PIPE
- Base unit
- LG
- MRP type
- Stock Item
- Criticality
- A (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 51 d
- Unit price
- Rp 1.7M (est.)
Recommendation
- 1.Forecast 0.4 LG/year: 0.4 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 3.
- 4.Stock 9 exceeds the level to keep (3) by 6.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
9 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
3
order qty 3
Service level
99.0%
stockout risk now 0%
Unit price
Rp 1.7M
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 36.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 1 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_HE-1483A C4 PRODUCT COOLER | A | 2 | 11 | 3.22 |
Lead time and procurement
Lead time 29 ± 18 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 23 Sept 2026 | Medium | PX_HE-1483A | HE-1483A fouling |
| 21 Aug 2026 | Low | PX_HE-1483A | Replace lamp as per PM finding |
| 15 Jul 2026 | Low | PX_HE-1483A | Painting HE-1483A |
| 28 Jun 2026 | High | PX_HE-1483A | Leak from packing |
| 08 Apr 2026 | Medium | PX_HE-1483A | HE-1483A tube leak |
| 04 Apr 2026 | Medium | PX_HE-1483A | Retubing HE-1483A |
| 31 Jan 2026 | Low | PX_HE-1483A | Replace lamp as per PM finding |
| 01 Jan 2026 | Medium | PX_HE-1483A | Replace lamp as per PM finding |
| 04 Dec 2025 | Medium | PX_HE-1483A | Install scaffolding at HE-1483A |
| 23 Oct 2025 | Medium | PX_HE-1483A | Install scaffolding at HE-1483A |
Recent goods issues
Never issued in the 17-month history.