ELBOW,90DEG,1-1/2IN,SCH80,SS316,SW
Material 4100029645 · ELBOW · Plant 1000
AMonitorHealthy
- Material
- 4100029645
- Category
- ELBOW
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (12 of 40 FuncLocs A/B)
- Supplier
- PRIMA LOGAM NUSANTARA PT
- Lead time
- 44 d · P80 53 d
- Unit price
- Rp 73,552
Recommendation
- 1.Forecast 450 EA/year: 450 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~44 days; expected demand during lead time 54.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 195, order up to 498.
- 4.Installed on 40 FuncLoc(s), 12 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 154Single sourceAbnormal consumptionOpen PO
On hand / on order
136 / 1,222
next delivery 03 Oct 2026
Today Min / Max
27 / 69
static parameters in BoM
Rec. Min (reorder point)
195
safety stock 142
Rec. Max
498
order qty 303
Service level
99.9%
stockout risk now 0%
Unit price
Rp 73,552
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 54 issue days in the last 180 days, last issue 1 days ago, 84 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 18 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (204 units) excluded from the baseline.
Demand pattern Smooth · 157 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 28.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~12 days.
Installed on 40 functional locations
12 with criticality A/B · 48 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_BF-112 CRACKING FURNACE BF-112 | A | 1 | 73 | 27.01 |
| PX_BF-102 CRACKING FURNACE BF-102 | A | 1 | 71 | 28.72 |
| PX_BF-103 CRACKING FURNACE BF-103 | A | 1 | 38 | 14.58 |
| PX_BF-104 CRACKING FURNACE BF-104 | A | 1 | 28 | 11.58 |
| PX_BF-111 CRACKING FURNACE BF-111 | A | 1 | 23 | 9.01 |
| PX_2-CW-24122-A22A-HS PIPE-2 FROM HE-848C TO PP-942D | A | 1 | 0 | 0.01 |
| PX_1-CW-17409-B23A-T PIPE-1 FROM HE-1561D TO HE-686C | B | 1 | 0 | 0.01 |
| PX_1-DS-10611-B22A-C PIPE-1 FROM VD-255 TO HE-1913 | B | 1 | 0 | 0.01 |
| PX_10-FG-29742-A41A-H PIPE-10 FROM HE-275C TO VD-408 | B | 1 | 0 | 0.01 |
| PX_3-IA-6844-C11A PIPE-3 FROM VD-843C TO VD-1832A | B | 1 | 0 | 0.01 |
| PX_3/4-BF-23136-A41A PIPE-3/4 FROM PP-1386 TO PP-583B | B | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 44 ± 34 days (PO history, 43 PO lines) · on-time 34%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Sept 2026 | PR03 Regular replenishment | 259 | Rp 73,246 | 19 Oct 2026 open | 35 d |
| 12 Sept 2026 | PR03 Regular replenishment | 282 | Rp 72,515 | 03 Oct 2026 open | 21 d |
| 24 Aug 2026 | PR01 Import / long-lead | 306 | Rp 72,145 | 26 Jan 2027 open | 155 d |
| 23 Aug 2026 | PR06 Regular replenishment | 196 | Rp 70,492 | 15 Oct 2026 open | 53 d |
| 20 Aug 2026 | PR03 Regular replenishment | 298 | Rp 72,480 | 26 Sept 2026 | 37 d |
| 11 Aug 2026 | PR03 Regular replenishment | 286 | Rp 74,039 | 23 Aug 2026 | 12 d |
| 04 Aug 2026 | PR03 Regular replenishment | 179 | Rp 72,249 | 18 Oct 2026 open | 75 d |
| 15 Jul 2026 | PR05 Project / turnaround | 219 | Rp 73,635 | 08 Aug 2026 | 24 d |
| 22 Jun 2026 | PR06 Regular replenishment | 264 | Rp 74,831 | 09 Jul 2026 | 17 d |
| 31 May 2026 | PR03 Regular replenishment | 293 | Rp 71,189 | 19 Jun 2026 | 19 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 30 Sept 2026 | Low | PX_BF-103 | Leak from packing |
| 30 Sept 2026 | Medium | PX_BF-112 | Install cover plate BF-112 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Low | PX_BF-112 | Painting BF-112 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 27 Sept 2026 | Medium | PX_BF-112 | Repair insulation BF-112 |
| 23 Sept 2026 | Low | PX_BF-102 | Replace burner tip BF-102 |
| 22 Sept 2026 | Medium | PX_BF-111 | Install cover plate BF-111 |
| 21 Sept 2026 | Medium | PX_BF-104 | Cleaning burner BF-104 |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 5 | 201000006629 | Corrective |
| 30 Sept 2026 | 6 | 201000025027 | Corrective |
| 25 Sept 2026 | 2 | 209000029477 | Other maintenance |
| 22 Sept 2026 | 2 | 201000011818 | Corrective |
| 22 Sept 2026 | 5 | 204000002989 | Preventive |
| 20 Sept 2026 | 2 | 201000000238 | Corrective |
| 04 Sept 2026 | 14 | 203000008243 | Turnaround |
| 03 Sept 2026 | 1 | 201000014482 | Corrective |
| 01 Sept 2026 | 1 | 201000023287 | Corrective |
| 17 Aug 2026 | 1 | 201000027971 | Corrective |
| 16 Aug 2026 | 1 | 204000010445 | Preventive |
| 14 Aug 2026 | 10 | 209000023087 | Other maintenance |
| 11 Aug 2026 | 1 | 201000005848 | Corrective |
| 10 Aug 2026 | 1 | 201000006061 | Corrective |
| 09 Aug 2026 | 1 | 204000027173 | Preventive |